4 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Fisheries Survey of Hill Creek (located on Highway 3)
Principal Investigator: Dahl-Fequet, Monica L
Licensed Year(s): 2005
Summary: The objective of this project is to collect biological and hydrological information on Hill Creek. It is unknown as to whether or not the culvert at the Hill Creek highway crossing is large enough to allow for the spring migration of spawning fish. The researchers will collect fisheries and habitat information on Hill Creek. This data will include fish presence/absence, lifestage and species com...


Fish Habitat Compensation Monitoring Program - Highway #3, Stagg River
Principal Investigator: Moore, Peter
Licensed Year(s): 2001 2000
Summary: This program is a detailed assessment of the created/enhanced habitat at Frank Channel, based on fish use and function in comparison with habitat design targets. Habitat monitoring will require seasonal assessments within the open water period at times associated with the targeted fish's life stages (Northern Pike). During early spring, mid summer and late summer, Frank Channel habitat will be m...


Highway #3 Reconstruction, Preferred Alignment Fisheries Habitat Assessments
Principal Investigator: Thomas, Craig J
Licensed Year(s): 1998
Summary: This study is to identify existing habitat characteristics of the potential and existing stream and pond crossings of the Highway #3 reconstruction project. Field studies will involve the identification of fish habitat characteristics, the potential identification of present fish species in those systems that suggest fish habitat is present by using seine netting techniques. Background data search...


Fish Habitat Study in Water Course from Bluefish Hydro Dam to Bluefish Trailrace
Principal Investigator: Jacobson, Toni Lynne
Licensed Year(s): 1996
Summary: Transportation to Bluefish Hydro Electric Plant is by boat from the Miramar Con Mine Dock at Prosperous Lake. Two one day field trips to the Plant are scheduled during the collection period. Equipment to be utilized include gill or seine nets, Gee traps, backpack electrofishing unit, water flow meter, water sample bottles, canoe and outboard motor. Sample species include whitefish, lake trout, ...


TOTAL PAGES: 1