6 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Tundra-climate interaction study
Principal Investigator: Humphreys, Elyn
Licensed Year(s): 2025
Summary: This licence has been issued for the scientific research application No. 6094. The long-term research objective of this project is to improve our understanding of the carbon, water and energy exchange between tundra and the atmosphere. Over the next five years, we plan to continue monitoring these exchanges between Tundra Shield ecosystems and the atmosphere. This long-term data will be analyze...


2001 Fish Habitat Assessments for Future Mine Road Developments
Principal Investigator: Moore, Peter
Licensed Year(s): 2001
Summary: Fish will be collected and released live using seining and electro-fishing techniques. Data collection will also include flow monitoring. All assessments will be completed on watercourses within the Misery Road, Sable Lake Road and Fox Lake Road developments within the mine site. BHP will provide support staff which will include people hired locally....


Water Balance Studies in the Coppermine River Basin: The Chain of Lakes Effect in Space and Time.
Principal Investigator: Maric, Robert
Licensed Year(s): 2001
Summary: The research team will be based out of Yellowknife. Travel to the Ekati Mine site will be by helicopter; travel on site will be on foot. The research team will be in the field for approximately seven days. Characterization of the hydrologic balance of the system under investigation will be completed by the collection of several hundred water samples (each with an approximate volume of 30 ml) at d...


Snare River Aqautic Study
Principal Investigator: Grabke, Dan
Licensed Year(s): 2000
Summary: In 1999, the Northwest Territories Power Corporation was awarded a 25 year water licence to operate its three hydroelectric plants on the Snare River. Conditions of this water licence included that two studies be done by the Corporation. The first study is an assessment addressing the removal of minimum flow requirements on two of the dams. This study will include a current assessment of fish a...


Spring Melt Hydrological Investigations at Daring Lake, N.W.T.
Principal Investigator: English, Michael C
Licensed Year(s): 2003 2002 2001 2000
Summary: Tthe objective of this study is to continue research examining the hydrological and energy budget of small arctic esker lake basin during the spring melt period. The intent of this research is to understand the relationship between the energy budget and changes in soil moisture, rates of evapotranspiration, and changes in water discharge from a small tundra basin underlain by permafrost. Transpo...


Hydrologic investigation of a Canadian Shield basin
Principal Investigator: Spence, Chris
Licensed Year(s): 2001 1999 1998
Summary: Lower Carp Lake is part of the Yellowknife River and is roughly 22km in size. A number of remote meteorological and hydrometric data collection sites will be constructed around the lake. An island on the lake will be used as a base camp for the research activities. This island is roughly circular rising up to 50m from the lakeshore. A portion of the island is dominated by sandy glacial deposits. M...


TOTAL PAGES: 1