9 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Courageous Lake Project
Principal Investigator: Duthie, Andrew
Licensed Year(s): 2012 2011 2010
Summary: The objective of the proposed studies to be conducted at Courageous Lake is to collect baseline data to characterize the environmental (physical and biological) setting in the proposed project area. Specifically, data will be collected to characterize the following environmental components: meteorology, wind resources, air quality, noise, hydrology, bathymetry, hydrogeology, aquatic resources, fis...


Combined Phase I/II ESAs for Five Sites
Principal Investigator: Zawacky, Summer R
Licensed Year(s): 2010
Summary: The objective of this study is to complete detailed site investigations at each location (5 in total) to determine environmental and physical conditions. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the identification of any hazardous or non-hazardous materials left on site. Columbia personnel will follo...


Environmental Site Assessments at Five Abandoned Mines
Principal Investigator: Ziervogel, Herb
Licensed Year(s): 2010
Summary: The objectives of this project are to conduct environmental site assessments at the five sites to identify the extent of various contaminations in the soil, water and sediments. A remediation action plan will be prepared for future cleanup at the sites. The field team will use shovel and hand auger to collect limited soil and waste rock samples for lab testing. The lab testing will focus on ...


Blanchet Mine/ O'Connor Island Phase III Environmental Site Assessments
Principal Investigator: Diplock, David A
Licensed Year(s): 2009
Summary: The objective of this study is to conduct a detailed site investigation of the Blanchet Island Mine to further determine current environmental and physical conditions. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the delineation of contamination from any hazardous or non-hazardous materials left on site. ...


Non-renewable Resource Assessment (Phase II Fieldwork), Edehzhie
Principal Investigator: Gal, Leonard
Licensed Year(s): 2003
Summary: The objective of the fieldwork is to further assess the non-renewable resource potential of the Edehzhie area, as a follow-up to Phase I work which was a review of existing data. This assessment is being carried out as part of the Northwest Territories P...


Environmental Baseline Program Colomac Area (Indin Lake), N.W.T.
Principal Investigator: Kalich, Laura
Licensed Year(s): 1996
Summary: The work will include seven aspects of research. Water quality will be done through a number of sampling locations at different times of the year. A hydrology study will measure high water discharge and stage measurements at seven streams in the vicinity of the proposed all-weather road. Bathymetric surveys will conducted on lex lake and six smaller un-named lakes in the vicinity of the propos...


Phase 3 Environmental Baseline Program, Diavik Diamond Project, Lac de Gras, NWT
Principal Investigator: Digel, Mark
Licensed Year(s): 1996 1995
Summary: Methods of data collection will include water quality and bottom sampling in Lac de Gras and Lac du Sauvage; automatic and manual water level recordings; bathometric work; automatic weather stations and the monitoring of air-borne particles and visibility; continuation of baseline studies of soils and terrain, and vegetation; fish population, habitat, health, and spawning habits studies; baseline ...


Licence #5041
Principal Investigator: Kalin, Margarete
Licensed Year(s): 1985
Summary: To compile and provide an analysis of the environmental status of "Hardrock" mining sites in the NWT and Yukon which became inactive before the year 1983....


Licence #2021
Principal Investigator: Sherstone, D.A.
Licensed Year(s): 1976
Summary: 1) To acquire aerial photography of hydrologic characteristics of the Mackenzie and Lower Liard River basins. 2) To acquire photography of environmentally sensititve areas along the Central Arctic gas pipeline route. 3) To acquire aerial photography of glacier research sites in the Arctic Islands area (particularly ...


TOTAL PAGES: 1