6 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Musetta-Lambert, Jordan Licensed Year(s):
2021
Summary:
This licence has been issued for the scientific research application No.4985.
The objectives of this project are to investigate impacts of permafrost slumping on water quality, benthic macroinvertebrate communities, fish communities and ecosystem function by (a) advancing research on previously studied thaw slumps within the Stony Creek Watershed and include unstudied (for biotic metrics) thaw ...
Principal Investigator:Johnson, Donald S. Licensed Year(s):
2007
2006200520042003 Summary:
Project a: essentially fifth year of research (sixth-year if associated work in 2000 is counted), and seeks to continue heretofore successful investigations into the nature, substance and long-term effects of contact between Copper Inuit and Europeans/Eurocanadians in the 19th and 20th centuries utilizing sociocultural, archaeological, and economic methodologies, b. Project seeks to initiate a col...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Inuvialuit Settlement Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Gwich'in Settlement Area. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or Renewable Resource Council (RRC) representative. Depending upon accessibility, sites will b...
Principal Investigator:Metikosh, Serge Licensed Year(s):
2001
Summary:
The research team proposes to collect information about fish habitat features and use on 111 watercourse crossings along the tentative pipeline corridor in the Gwich'in Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller watercourses (t...
Principal Investigator:Jalkotzy, Peter Licensed Year(s):2001
2000
Summary:
The research team will conduct a lake and fish habitat survey, to identify which water bodies have the following characteristics: overwintering fish, lake depths greater than 3.5 feet and water quality conditions which are not suitable for overwintering fish. The research team will consist of 3 crews, 4 men/crew. Crews will receive their safety and sampling orientation in Tuktoyaktuk Harbour at ...