5 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Kasook, Davonna C Licensed Year(s):2018
2017
Summary:
The objective is to compare differences in snow depth, density and morphology of a heavily forested site and a tundra site. The Principal Investigator (PI) will study the effect landscape (forest vs. tundra) has on seasonal snow pack evolution and physical properties (density, temperature, snow grain morphology, and stratigraphy) of the snowpack. These results will be compared to historical data (...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
From 2001 to 2004, aquatics studies were done in the Niglintgak, Taglu and Parsons Lake lease areas and along the proposed gathering pipeline. In addition, aquatic studies at proposed infrastructure sites and borrow pits were initiated in 2004. The 2005 studies are a continuation of the work done in previous years. The work will include additional investigations into fish and fish habitat, hydrolo...
Principal Investigator:Forbes, Donald L Licensed Year(s):
1991
1990 Summary:
The Researchers will use the ARKTOS 5 amphibious vehicle for geophysical surveying in the vicinity of Tuktoyaktuk and the proposed Amauligak pipeline landing site on Richards Island. They will measure nearshore sediment dynamics using wave and current meters at selected locations in the vicinity of the proposed pipeline landing site at North Head....
Principal Investigator:Erickson, Dave Licensed Year(s):
1991
Summary:
The Researcher and his team will carry out a project to improve water flow studies, channel dredging, mapping and local construction surveys....
Principal Investigator:Sherstone, David A. Licensed Year(s):
1979
Summary:
To conduct aerial photography to identify possible ice jam areas. To conduct aerial photography to identify alternate pipeline routes. To collect samples of river water for sediment load analysis....