4 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
2002 Summary:
Noise monitoring will be conducted in the Taglu lease and in the Swimming Point, Parsons Lake and Jimmy Lake regions. These data will provide estimates of background ambient noise which will be needed before construction of the Mackenzie Gas Project. Pr...
Principal Investigator:Forbes, Donald L Licensed Year(s):
1991
1990 Summary:
The Researchers will use the ARKTOS 5 amphibious vehicle for geophysical surveying in the vicinity of Tuktoyaktuk and the proposed Amauligak pipeline landing site on Richards Island. They will measure nearshore sediment dynamics using wave and current meters at selected locations in the vicinity of the proposed pipeline landing site at North Head....
Principal Investigator:Boyes, Donald M. Licensed Year(s):19951994
1990
Summary:
The Researcher and team propose to provide a better understanding of the present fluvial regime in the area and a method of assessing the effects of uncontrollable influences such as global warming and controllable factores such as hydro-electric and pipeline development....
Principal Investigator:Wankiewicz, Anthony Licensed Year(s):
1977
Summary:
To study permafrost near Arctic streams at sites near Inuvik and several locations in the Keewatin. This study is to provide baseline information on coupled heat-transfer processes relevant to cold gas pipeline stream crossings. The ground temperature will be monitored at stream cross sections at the different sites....