2 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
Summary:
This project is a continuation of work that began in 2004. The Niglintgak Gas Processing facility may be constructed on a seaworthy barge, transported to a staging site in the Beaufort Sea, and then towed through the Mackenzie Delta channels to a sheltered location in Little Kumak Channel where the barge set-down site is proposed. This study will look at the environmental conditions along the pro...
Principal Investigator:Forbes, Donald L Licensed Year(s):
1991
1990 Summary:
The Researchers will use the ARKTOS 5 amphibious vehicle for geophysical surveying in the vicinity of Tuktoyaktuk and the proposed Amauligak pipeline landing site on Richards Island. They will measure nearshore sediment dynamics using wave and current meters at selected locations in the vicinity of the proposed pipeline landing site at North Head....