43 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

MGM Energy Corp. 2007, 2008 and 2009 Summer Field Assessment and Advance Barge Project (the Project)
Principal Investigator: Maaskant, Shirley
Licensed Year(s): 2009 2007
Summary: This study is a field assessment which consists of targeted visits to selected sites, identified within the delineated barge landing sites and drilling target areas. Overland access routes will be visited, though these corridors have not been determined at this time. Information collected during the summer studies will be used in planning and determining appropriate locations for winter drilling a...


EnCana Corporation Richards Island 2006 Summer and Fall Field Assessment Program
Principal Investigator: Marken, Sandra L
Licensed Year(s): 2006
Summary: The objective of the study is to determine: the best access for a drilling and development location on Richards Island, which lakes may be suitable for water withdrawal, and geotechnical baseline conditions along a proposed pipeline corridor, proposed gas conditioning facility location, and possible quarry site. The bathymetry program will use a portable zodiac and bathymetry equipment to asses...


Bathymetric and Shallow Sediment Core Sampling in McKinley Bay, NWT
Principal Investigator: Hammer, Lorne
Licensed Year(s): 2006
Summary: Shell Exploration and Production Company (Shell) is proposing to mobilize the Mobile Offshore Drilling Unit (MODU), Kulluk, from McKinley Bay, Northwest Territories to offshore Alaska, to initiate preparations for an offshore exploration drilling program to be carried out over the next several years. The Kulluk has been inactive and moored in McKinley Bay since 1993. Prior to that, the Kulluk had ...


2006 Biophysical and Reconnaissance Studies in the Inuvialuit Settlement Region
Principal Investigator: Martin, Sandy D
Licensed Year(s): 2006
Summary: The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies. Route and site reconnaissance comprise: verification of the ...


Inventory and assessment of drilling waste sumps in the Mackenzie Delta of the Inuvialuit Settlement Region
Principal Investigator: Quaife, Ron
Licensed Year(s): 2005
Summary: This research will help address growing concerns over the use of sumps as a disposal option for drilling waste in the Inuvialuit Settlement Region and is a first step in evaluating the environmental conditions at historic sump sites. The specific objectives of this research include: 1) conducting an inventory of all known specified drilling sump locations within the ISR (including location, last ...


Inventory and assessment of drilling waste sumps in the Mackenzie Delta of the Inuvialuit Settlement Region
Principal Investigator: Graf, Linda H
Licensed Year(s): 2005
Summary: This research will help address growing concerns over the use of sumps as a disposal option for drilling waste in the Inuvialuit Settlement Region and is a first step in evaluating the environmental conditions at historic sump sites. The specific objectives of this research include: 1) conducting an inventory of all known specified drilling sump locations within the ISR (including location, last k...


2005 Terrestrial Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The 2005 terrestrial studies in the Inuvialuit Settlement Region (ISR) will include vegetation classification, rare plant surveys, and landform, soil and permafrost investigations. The studies will be conducted by three- or four-person crews supported by helicopter and based in Inuvik. A local assistant will be hired as part of each survey team. Air calls from a helicopter will be used to map ...


2005 Summer and Fall Aquatic Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: From 2001 to 2004, aquatics studies were done in the Niglintgak, Taglu and Parsons Lake lease areas and along the proposed gathering pipeline. In addition, aquatic studies at proposed infrastructure sites and borrow pits were initiated in 2004. The 2005 studies are a continuation of the work done in previous years. The work will include additional investigations into fish and fish habitat, hydrolo...


2005 Route and Site Reconnaissance in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The route and site reconnaissance activities will be used to: review the proposed location for a potential gas gathering system and potential pipeline route through the Inuvialuit Settlement Region; revisit or determine the optimal locations for infrastructure sites, roads, granular resource sites, water withdrawal sites, and potential revegetation test sites; visually inspect and confirm land for...


2005 Winter Field Geotechnical Investigation Program in the Inuvialuit Settlement Region
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005
Summary: This program will investigate five potential sources of granular materials and subsurface drilling at the proposed Storm Hills Pigging Facility. It is estimated that the program will require up to 90 days to complete. Up to 45 persons are expected to wor...


TOTAL PAGES: 5