43 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Maaskant, Shirley Licensed Year(s):2009
2007
Summary:
This study is a field assessment which consists of targeted visits to selected sites, identified within the delineated barge landing sites and drilling target areas. Overland access routes will be visited, though these corridors have not been determined at this time. Information collected during the summer studies will be used in planning and determining appropriate locations for winter drilling a...
Principal Investigator:Marken, Sandra L Licensed Year(s):
2006
Summary:
The objective of the study is to determine: the best access for a drilling and development location on Richards Island, which lakes may be suitable for water withdrawal, and geotechnical baseline conditions along a proposed pipeline corridor, proposed gas conditioning facility location, and possible quarry site.
The bathymetry program will use a portable zodiac and bathymetry equipment to asses...
Principal Investigator:Hammer, Lorne Licensed Year(s):
2006
Summary:
Shell Exploration and Production Company (Shell) is proposing to mobilize the Mobile Offshore Drilling Unit (MODU), Kulluk, from McKinley Bay, Northwest Territories to offshore Alaska, to initiate preparations for an offshore exploration drilling program to be carried out over the next several years. The Kulluk has been inactive and moored in McKinley Bay since 1993. Prior to that, the Kulluk had ...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies.
Route and site reconnaissance comprise: verification of the ...
Principal Investigator:Quaife, Ron Licensed Year(s):
2005
Summary:
This research will help address growing concerns over the use of sumps as a disposal option for drilling waste in the Inuvialuit Settlement Region and is a first step in evaluating the environmental conditions at historic sump sites. The specific objectives of this research include: 1) conducting an inventory of all known specified drilling sump locations within the ISR (including location, last ...
Principal Investigator:Graf, Linda H Licensed Year(s):
2005
Summary:
This research will help address growing concerns over the use of sumps as a disposal option for drilling waste in the Inuvialuit Settlement Region and is a first step in evaluating the environmental conditions at historic sump sites. The specific objectives of this research include: 1) conducting an inventory of all known specified drilling sump locations within the ISR (including location, last k...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
The 2005 terrestrial studies in the Inuvialuit Settlement Region (ISR) will include vegetation classification, rare plant surveys, and landform, soil and permafrost investigations. The studies will be conducted by three- or four-person crews supported by helicopter and based in Inuvik. A local assistant will be hired as part of each survey team.
Air calls from a helicopter will be used to map ...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
From 2001 to 2004, aquatics studies were done in the Niglintgak, Taglu and Parsons Lake lease areas and along the proposed gathering pipeline. In addition, aquatic studies at proposed infrastructure sites and borrow pits were initiated in 2004. The 2005 studies are a continuation of the work done in previous years. The work will include additional investigations into fish and fish habitat, hydrolo...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
The route and site reconnaissance activities will be used to: review the proposed location for a potential gas gathering system and potential pipeline route through the Inuvialuit Settlement Region; revisit or determine the optimal locations for infrastructure sites, roads, granular resource sites, water withdrawal sites, and potential revegetation test sites; visually inspect and confirm land for...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
Summary:
This program will investigate five potential sources of granular materials and subsurface drilling at the proposed Storm Hills Pigging Facility. It is estimated that the program will require up to 90 days to complete. Up to 45 persons are expected to wor...