Principal Investigator:Povey, Andrew Licensed Year(s):
2004
20032002 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This project is for aqu...
Principal Investigator:Graburn, Larry Licensed Year(s):2004
2003
Summary:
The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...
Principal Investigator:McKinnon, Greg Licensed Year(s):
1976
Summary:
To assess the short and long term effects of highway construction on the aquatic resources of three streams....
Principal Investigator:Jasper, J.N. Licensed Year(s):
1976
Summary:
To measure peak flows to determine designs for proposed culvert and bridge sites along the Mackenzie Highway and to assess Environmental conditions (erosion, etc.) at stream crossings before and after construction and to determine their effects on fish migration....
Principal Investigator:Davison, D.M. Licensed Year(s):
1975
Summary:
(1) To gather field data in order to assess drainage and erosion control and to evaluate the stability of slopes along the proposed Foothills Pipeline and at key river crossings; (2) To gather subsurface soil and ice information to analyze typical slope conditions for pipe support designs for Foothills Pipeline Limited....