15 record(s) found in the location "Dehcho Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Pine Point Railbed ESA
Principal Investigator: Nearing, Michelle
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.5047. The objective of the study is to determine environmental conditions (in particular metal concentrations) and to compare existing conditions on and near the Rail Bed to background. The proposed field program will focus on collecting information that is considered critical for completing a human health and ecological ri...


Phase III ESA - Fort Simpson RCMP Detachment
Principal Investigator: Schulz, Eva
Licensed Year(s): 2013
Summary: The main objective of the Phase III Environmental Site Assessment is to delineate the hydrocarbon contamination at the site resulting from an overflow of fuel at a vent pipe of an above ground storage tank. Test holes will be excavated with a backhoe around the former spill area in order to collect soil samples. Each sample will be submitted to a Canadian Association for Laboratory Accreditatio...


O-80 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licensed Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


K-29 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licensed Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


M-25 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licensed Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


O-35 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licensed Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the local community, will access the site and assess the site conditions. The researchers will access the site via helicopter and will complete a walk around of the site including the site facilities and surrounding area. Should any soil or surface water be identified as a concern, a sample will be obtained and...


F-36 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licensed Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the local community, will access the site and assess the site conditions. The researchers will access the site via helicopter and will complete a walk around of the site including the site facilities and surrounding area. Should any soil or surface water be identified as a concern, a sample will be obtained and...


Supplemental Phase II Environmental Site Assessment, N-01 Wellsite
Principal Investigator: Kustan, Ed
Licensed Year(s): 2005 2004
Summary: The purpose of this work is to add to the work that was done in 2002-2004 at the N-01 wellsite as part of an environmental assessment of the wellsite and associated facilities. This phase of the environmental assessment of the wellsite and associated facilities may include: additional vertical and horizontal delineation of environmental impacts; installation of two additional groundwater monitori...


Phase II Environmental Site Assessment at Pointed Mountain Gas Plant and Associated Facilities
Principal Investigator: Stone, Larry
Licensed Year(s): 2006 2005 2004 2003 2002
Summary: The Pointed Mountain Gas Plant, four associated wellsites, and some associated infrastructure are being decommissioned. The site was originally constructed in 1966 and has been shut down since September 2001. Previous environmental work and public consul...


Post Construction Revegetation and Soil Monitoring for the Liard Pipeline and Gathering Project, Fort Liard, NT and Maxhamish Area, BC
Principal Investigator: Kustan, Ed
Licensed Year(s): 2004
Summary: The purpose of this monitoring program is to assess reclamation success and identify areas of concern regarding revegetation and soil loss by erosion. A total of eight permanent sampling transects were established along the pipeline right-of-way; two in...


TOTAL PAGES: 2