Modified Phase II Environmental Site Assessment F-36 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003 2002
Summary: The environmental assessment of the wellsite and the associated facilities may include 1) a walk around of the lease area to identify additional environmental issues if any; 2) a modified Phase II Assessment (including assessing the areas of the glycol,...


Post Construction Water Quality Monitoring and Pipeline Monitoring for the Liard Pipeline and Gathering Project, Fort Liard, NT and Maxhamish Area, BC
Principal Investigator: Ferguson, Gordon
Licensed Year(s): 2003 2002
Summary: A total of eight permanent sampling transects will be established along the pipeline right-of-way; two in each of the four dominant representative vegetation habitats. Site-specific evaluations at each transect will measure re-vegetative success using ve...


2002 Aquatic Studies in the Deh Cho Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Deh Cho Region. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or community representative. Depending upon accessibility, sites will be accessed by helicopter and an i...


Licence #5015
Principal Investigator: Harry, David
Licensed Year(s): 1985
Summary: A project directed toward the prediction and monitoring of geomorphic and geologic conditions along the route of the Norman Wells-Zana pipeline. Fieldwork will focus on investigation of terrain conditions during and subsequent to the 1984-85 winter construction season....


Licence #2449
Principal Investigator: Sherstone, David A.
Licensed Year(s): 1979
Summary: To conduct aerial photography to identify possible ice jam areas. To conduct aerial photography to identify alternate pipeline routes. To collect samples of river water for sediment load analysis....