4 Dossier(s) trouvé(s) à l’emplacement "Région du Dehcho" (les projets pluriannuels sont regroupés):
Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..

M-25 Environmental Site Assessment 2005
chercheur principal: Kustan, Ed
Année(s) de permis: 2005
Résumé: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


2004 Terrestrial Studies in the Deh Cho Region
chercheur principal: Povey, Andrew
Année(s) de permis: 2004 2003 2002
Résumé: Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. Local k...


Modified Phase II Environmental Site Assessment F-36 Wellsite
chercheur principal: Miller, Samantha
Année(s) de permis: 2003 2002
Résumé: The environmental assessment of the wellsite and the associated facilities may include 1) a walk around of the lease area to identify additional environmental issues if any; 2) a modified Phase II Assessment (including assessing the areas of the glycol,...


Post Construction Water Quality Monitoring and Pipeline Monitoring for the Liard Pipeline and Gathering Project, Fort Liard, NT and Maxhamish Area, BC
chercheur principal: Ferguson, Gordon
Année(s) de permis: 2003 2002
Résumé: A total of eight permanent sampling transects will be established along the pipeline right-of-way; two in each of the four dominant representative vegetation habitats. Site-specific evaluations at each transect will measure re-vegetative success using ve...


TOTAL PAGES: 1