Principal Investigator:Mochnacz, Neil Licensed Year(s):
2006
Summary:
The Mackenzie Gas Pipeline will cross more than 600 tributaries of the Mackenzie River, ranging from small (< 1 m) vegetated swales to large rivers. All construction methods, with the exception of trenchless drilling, will disturb the bed and banks of the rivers they cross. Fish habitat use and distribution has not been studied in sufficient detail.
Fish will be captured and identified for spec...
Principal Investigator:Miller, Samantha Licensed Year(s):
2003
Summary:
The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the O-35 wellsite. In August 2002, an Environmental Site Assessment was conducted....
Principal Investigator:Miller, Samantha Licensed Year(s):
2003
Summary:
The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the N-01 wellsite and to set up background concentrations of parameters for the lea...
Principal Investigator:Miller, Samantha Licensed Year(s):
2003
2002 Summary:
The objectives of this assessment are to conduct a soil investigation and remediation associated with the flare stack at the Paramount Resources Ltd. F-36 Wellsite. In August 2002, a modified Phase II Environmental Site Assessment was conducted. The bas...
Principal Investigator:Hong, Tom Licensed Year(s):
2002
Summary:
A pre-construction biophysical site assessment will focus on wildlife and vegetation. The proposed well-sites will be examined on foot, and the flowlines walked to document vegetation types, including rare species if present. Main vegetation types will b...