Pine Point Railbed ESA
Principal Investigator: Nearing, Michelle
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.5047. The objective of the study is to determine environmental conditions (in particular metal concentrations) and to compare existing conditions on and near the Rail Bed to background. The proposed field program will focus on collecting information that is considered critical for completing a human health and ecological ri...


M-25 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licensed Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


Non-renewable Resource Assessment (Phase II Fieldwork), Edehzhie
Principal Investigator: Gal, Leonard
Licensed Year(s): 2003
Summary: The objective of the fieldwork is to further assess the non-renewable resource potential of the Edehzhie area, as a follow-up to Phase I work which was a review of existing data. This assessment is being carried out as part of the Northwest Territories P...


Modified Phase II Environmental Site Assessment O-35 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003
Summary: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the O-35 wellsite. In August 2002, an Environmental Site Assessment was conducted....


Modified Phase II Environmental Site Assessment N-01 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003
Summary: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the N-01 wellsite and to set up background concentrations of parameters for the lea...


Modified Phase II-III Environmental Site Assessment F-36 Wellsite
Principal Investigator: Miller, Samantha
Licensed Year(s): 2003 2002
Summary: The objectives of this assessment are to conduct a soil investigation and remediation associated with the flare stack at the Paramount Resources Ltd. F-36 Wellsite. In August 2002, a modified Phase II Environmental Site Assessment was conducted. The bas...


Post Construction Water Quality Monitoring and Revegetation and Soil Monitoring for the Liard Pipeline and Gathering Project, Fort Liard, NT and Maxhamish Area, BC
Principal Investigator: Ferguson, Gordon
Licensed Year(s): 2003 2002
Summary: This monitoring program is designed to monitor water quality in the Liard pipeline study area and to assess reclamation success and identify areas of concern regarding revegetation and soil loss by erosion. A total of 8 permanent sampling transects were...


Environmental Assessment for Drilling and Access Development in the Fort Liard Area
Principal Investigator: Mears, Margaret
Licensed Year(s): 2002
Summary: Baseline studies will be conducted for the proposed wellsite, access roads and other related infrastructure. The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. For the...


Environmental Assessment for the Fort Liard Area Seismic, Drilling and Development Project, Fort Liard, NT.
Principal Investigator: Antoine, Don
Licensed Year(s): 2001
Summary: Nahendeh Land and Environmental Services proposes to conduct baseline studies on behalf of Anadarko Canada Corporation, to determine the presence or absence of fish and wildlife habitat in the vicinity of the proposed project. The wildlife program will consist of a literature review, which would document any information on wildlife populations in the general project area, and identify any data ga...


Environmental Assessment for Petroleum Exploration, Drilling and Development, Cameron Hills, NWT.
Principal Investigator: Mears, Margaret
Licensed Year(s): 2000
Summary: Western was contracted on behalf of Paramount Resources to conduct preliminary baseline studies at Paramount's land holdings, and a proposed access corridor in the Cameron Hills area. The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A preliminary survey of the physical, chemical and biological features of the...