Principal Investigator:Thomas, Craig J Licensed Year(s):2008
2005
Summary:
The objective of this study is to collect fish habitat data at stream crossings of the Prairie Creek Winter access road alignment. The information will support documentation requirements for the Department of Fisheries and Oceans relating to the Fisheries Act, as well as the potential need for a Fisheries Authorization for the re-establishment of the Winter Access Road to proceed in the 2005-2006 ...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Ltd., and ExxonMobil Canada Properties conducted a number of baseline studies during 2001, 2002, and 2003 as part of the Mackenzie Gas Project. These...
Principal Investigator:Povey, Andrew Licensed Year(s):20042003
2002
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Deh Cho Region. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or community representative. Depending upon accessibility, sites will be accessed by helicopter and an i...
Principal Investigator:Whitney, Paul Licensed Year(s):
1975
Summary:
Survey all streams to be crossed by the proposed Foothills Pipeline, conduct aerial and ground surveys of rare and endangered species, and inspect all stockpile and comprssor stations and wharfing sites associated with the proposed pipeline for Foothills Pipeline....