8 record(s) found in the location "Dehcho Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Pointed Mountain Pipeline Abandonment Project
Principal Investigator: Carnochan, Stacey
Licensed Year(s): 2023
Summary: This licence has been issued for the scientific research application No.5579. The proposed fieldwork will inform the baseline setting of the Canada Energy Regulator (CER) Application amendment on while also aiding in the development of feasible mitigation measures that will reduce potential effects that the Project may have on aquatic environments, wetlands, wildlife, and vegetation. As well, t...


Permafrost vulnerability assessment and landscape changes related to climate change in the Jean Marie River First Nation
Principal Investigator: Ireland, Margaret
Licensed Year(s): 2012
Summary: The objectives of this project are to: 1. Gather Traditional, local, and scientific knowledge and information concerning environmental and cultural changes related to climate change and permafrost degradation. 2. Conduct a focus group mapping session, a geological survey, and an air photo survey of Jean Marie River (JMR) and the surrounding area to locate vulnerable areas of land to climate c...


2004 Terrestrial Studies in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: Imperial Oil Resources Ventures Limited, Aboriginal Pipeline Group, ConocoPhillips Canada (North) Limited, Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. Local k...


2004 Summer Reconnaissance Program in the Deh Cho Region
Principal Investigator: Graburn, Larry
Licensed Year(s): 2004 2003
Summary: The objective of this program is to carry out aerial reconnaissance and preliminary site investigations, topographical aerial mapping, and surface reconnaissance in the general vicinity of the proposed route for the Mackenzie Gas Project. Information fro...


Determining Sensitive Areas and Appropriate Management Practices for the North Karst
Principal Investigator: Hayes, Sharon
Licensed Year(s): 2004
Summary: Boundary expansion processes for Nahanni National Park Reserve have identified the North Karst as an area of considerable interest. This area is significant for its elaborate assemblages of landforms, its individual landforms and its inhibition of the l...


Licence #1939
Principal Investigator: Wooley, David R.
Licensed Year(s): 1976
Summary: To carry out aerial reconnaissance studies (locating and counting ungulates) associated with environmental input into pipeline design and location....


Licence #1908
Principal Investigator: Whitney, Paul
Licensed Year(s): 1975
Summary: Survey all streams to be crossed by the proposed Foothills Pipeline, conduct aerial and ground surveys of rare and endangered species, and inspect all stockpile and comprssor stations and wharfing sites associated with the proposed pipeline for Foothills Pipeline....


Licence #1868
Principal Investigator: Sherstone, D.A.
Licensed Year(s): 1975
Summary: To acquire aerial photographs of: (1) hydrologic characteristics of the Mackenzie and Liard River Basins. (2) glacier research sites in the Arctic islands....


TOTAL PAGES: 1