7 dossier(s) trouvé(s) portant l’étiquette "hazardous materials" (les projets pluriannuels sont regroupés):
Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..

PWGSC Gordon Lake Environmental Site Assessments
chercheur principal: Nyman, Jeff
Année(s) de permis: 2013
Résumé: The objective of this program is to determine the environmental and physical conditions at nine sites on Gordon Lake. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the identification of any hazardous or non-hazardous materials. In addition, samples of biota (including vegetation, fish, benthic invertebrates) m...


Phase I/II/III ESAs and Risk Assessment
chercheur principal: Hamilton, Melissa M
Année(s) de permis: 2013
Résumé: The purpose of each Phase I/II Environmental Site Assessment (ESA) is to determine the current environmental and physical conditions at each site to allow for the potential future development of the appropriate remediation or risk management strategies and costs. This will include the identification and quantification of environmental impacts to all media including soil, sediment, surface water a...


Phase II Environmental Assessments of six sites in the Northwest Territories
chercheur principal: Winch, Susan
Année(s) de permis: 2012
Résumé: The objective of this research project is to conduct Phase II Environmental Site Assessments (ESAs) at six locations located within the Northwest Territories (NT). The purpose of field investigations at Caribou Point, Crestaurum Mine, Sun-Rose Claim Group, Thompson-Lundmark Mine, Wrigley Point, and Dome Lake is to determine the current environmental and physical conditions at each site and to red...


Combined Phase I/II Environmental Site Assessment of Ten Sites; Norris Lake Gold Exploration Site, River Lake Portage Dump, Wijinnedi Lake Exploration Site, Martin House Fuel Cache, Pine Point Railbed
chercheur principal: Zawacky, Summer R
Année(s) de permis: 2012
Résumé: The objective of this study is to complete comprehensive site investigations at each location (10 in total) to determine environmental and physical conditions. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the identification of any hazardous or non-hazardous materials left on site. Columbia personnel will f...


Combined Phase I/II ESAs for Five Sites
chercheur principal: Zawacky, Summer R
Année(s) de permis: 2010
Résumé: The objective of this study is to complete detailed site investigations at each location (5 in total) to determine environmental and physical conditions. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the identification of any hazardous or non-hazardous materials left on site. Columbia personnel will follo...


Phase II Environmental Site Assessment of ten (10) site along the Canol Trail (NM050)
chercheur principal: Hadley, Katherine
Année(s) de permis: 2009
Résumé: The purpose of the Phase II ESAs is to further determine the current environmental and physical conditions at 10 sites along the Canol Trail and to reduce data gaps and allow development of the appropriate remediation strategies and costs. This will include the identification and quantification of environmental impacts to soil, sediment, surface water and groundwater, as well as the identificatio...


Sediment Investigation of Baker Creek Giant Mine, Yellowknife, NT
chercheur principal: Barnette, Laura M
Année(s) de permis: 2005
Résumé: The objective of the study is to: determine the spatial extent of sediments enriched by tailings solids; characterize the physical and geochemical characteristics of contaminated sediments in Baker Creek; determine to what extent arsenic and other elements of concern in these materials can be remobilized into the water column. Given the shallow water depth in Baker Creek, the majority of sedime...


TOTAL PAGES: 1