12 dossier(s) trouvé(s) portant l’étiquette "all-weather road" (les projets pluriannuels sont regroupés): Vous ne trouvez pas les résultats souhaités? Essayez la recherche avancée..
chercheur principal:MacDonald, Alan R Année(s) de permis:
2020
Résumé:
This licence has been issued for the scientific research application No.4738.
The objective of this project is to collect sufficient information to determine the feasibility of construction of an all weather access road, creek crossing and pads in the Study Area. The results of the 2018 ATCO studies show that the development of the area can be done in a manner that would protect the environment...
chercheur principal:McLenaghan, Amy Année(s) de permis:
2018
Résumé:
The goal of this project is to identify invasive plant species on portions of the proposed Prairie Creek all season road from the Liard Highway to the Prairie Creek mine to support environmental approval as per the Mackenzie Valley Review Board’s Report of Environmental Assessment.
Walking and driving surveys will be employed as described in the report on the 2016 Survey of Exotic Plants along ...
chercheur principal:Sparling, Paul D Année(s) de permis:
2018
Résumé:
The purpose of the study is to create a data base that will allow for informed decisions to direct the appropriate environmental responses to road issues and community fish management and harvest issues. This program will also provide a knowledge base to the Inuvialuit that will allow for the wise and sustainable long term management of fish resources in the study area.
This program will involv...
chercheur principal:Goad, Robin E Année(s) de permis:20172016201420132012201120102009
2008
2006200520042003 Résumé:
The objective of this study is to conduct environmental surveys in the area surrounding the NICO Project camp and along the proposed routes of an all-weather access road and a transmission line to the Snare River Hydroelectric station.
The scope of the studies will include fish and fish habitat, hydrology and water quality surveys. Site visits by field staff and assistants will be made during...
chercheur principal:Goad, Robin E Année(s) de permis:
2004
Résumé:
Fortune Minerals is considering building an all-weather access road to their current expanded exploration program on the NICO property. This program will require environmental baseline surveys to augment existing information on species and habitat in the...
chercheur principal:Povey, Andrew Année(s) de permis:
2004
2003 Résumé:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Ltd., and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study has two compone...
chercheur principal:Povey, Andrew Année(s) de permis:2005
2004
Résumé:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Ltd., and ExxonMobil Canada Properties conducted a number of baseline studies during 2001, 2002, and 2003 as part of the Mackenzie Gas Project. These...
chercheur principal:Povey, Andrew Année(s) de permis:2005
2004
2003 Résumé:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Ltd., and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study has two compone...
chercheur principal:Povey, Andrew Année(s) de permis:2005
2004
2003 Résumé:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study has three co...
chercheur principal:Callow, Lin Année(s) de permis:
2004
Résumé:
The objective of these trials is to evaluate the performance of Low Ground Pressure Vehicles (LGPV) on frozen tundra without surface preparation. The effects of LGPV passage on soil, permafrost, and vegetation will be monitored and the details of each tr...