Régions: Gwich'in Settlement Area
étiquettes: physical sciences, environmental impact, petroleum industry, land use planning, industrial development, Gwich'in, Mackenzie Gas Project, infrastructure, pipeline construction, environmental protection plan, noise pollution, ambient noise
chercheur principal: | Povey, Andrew (93) |
Nᵒ de permis: | 13391 |
Organisation: | TeraAGA Consulting Group |
Année(s) de permis: |
2003
2002
|
Délivré: | nov. 26, 2002 |
Équipe de projet: | Michael S. |
Objectif(s): Imperial Oil Resources, Aboriginal Pipeline Group, Conoco Canada Resources Limited, Shell Canada Limited, and ExxonMobil Canada initiated a number of Biophysical Baseline Studies during 2001 as part of a feasibility study for the Mackenzie Gas Project. These studies are being continued in 2002. Local knowledge and technical/scientific research, in combination with a synthesis of existing technical information, is being used to develop a suitable knowledge base for planning, assessment of impacts and development of environmental protection plans. The TeraAGA Consulting Group has been retained to conduct the baseline studies. The baseline noise monitoring program in the Gwich'in Settlement Area will focus on the collection of baseline noise data at the proposed location of the potential facilities near Inuvik.