14 record(s) found with the tag "noise pollution" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

PIONEER (Effects of underwater noise and chemical PollutIOn on heariNg abilitiEs of cEtaceans in the Arctic)
Principal Investigator: Morell Ybarz, Maria
Licensed Year(s): 2024
Summary: This licence has been issued for the scientific research application No. 5876. The aim of this study is to identify and quantify the effects of noise on hearing in cetaceans in the Arctic. Ears of harvested belugas in Hendrickson Island will be used to determine if the individuals suffered a hearing impairment, and if it is compatible with noise exposure. (1) After the head and lower jaws ha...


Noise impacts on ringed seals
Principal Investigator: Insley, Stephen
Licensed Year(s): 2024 2023 2022
Summary: This licence has been issued for the scientific research application No. 5805. Our project has two main objectives: 1) Examine the impacts of underwater noise from vessel traffic on ringed seals. 2) Examine the spatial ecology of ringed seals in the western Canadian Arctic and estimate their exposure to underwater noise from vessel traffic. Within all of these objectives, the team will b...


Gahcho Kue Project Studies
Principal Investigator: Bekhuys, Tim
Licensed Year(s): 2006 2005
Summary: Baseline studies in the Gahcho Kue (Kennady Lake) area, in conjunction with the DeBeers Gahcho Kue Diamond Mine Project, have been ongoing since 1998. AMEC Earth and Environmental has been contracted by DeBeers to conduct these studies. This year, independent of the Mackenzie Valley Environmental Impact Review Board's regulatory requirements*, two studies are planned to be conducted in the project...


2003 Summer Baseline Noise Monitoring Program in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003
Summary: Noise monitoring will be conducted at select potential locations for facilities, infrastructure and granular resources in the Deh Cho Region where there is the potential for noise affecting people and wildlife during the construction and operations of th...


2003 Summer Baseline Noise Monitoring Program in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003
Summary: Noise monitoring will be conducted at select potential locations for facilities, infrastructure, access roads and granular resources in the Sahtu Settlement Area where there is the potential for noise affecting people and wildlife during the construction...


2003 Summer Baseline Noise Monitoring Study in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003 2002
Summary: Noise monitoring will be conducted at the proposed location of potential facilities near Inuvik as well as at select potential locations for infrastructure, access roads and granular resources in the Gwich'in Settlement Area where there is the potential...


2003 Summer Baseline Noise Monitoring Study in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003
Summary: Noise monitoring will be conducted within the Niglintgak, Taglu and Parsons Lake Leases as well as at select potential locations for facilities, infrastructure, access roads and granular resources in the Inuvialuit Settlement Region where there is the po...


2003 Winter Baseline Noise Monitoring Program in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003
Summary: Noise monitoring will be conducted at a potential facility location near Fort Good Hope and near the Blackwater River. These data will provide estimates of current background ambient noise in the project area, prior to construction of the Mackenzie Gas P...


2003 Winter Baseline Noise Monitoring Program in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003
Summary: Noise monitoring will be conducted at two potential sites for a compressor station near Travaillant Lake. These data will provide estimates of background ambient noise, which is needed before construction of the Mackenzie Gas Project. The proposed monit...


2003 Winter Baseline Noise Monitoring Study in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003 2002
Summary: Noise monitoring will be conducted in the Taglu lease and in the Swimming Point, Parsons Lake and Jimmy Lake regions. These data will provide estimates of background ambient noise which will be needed before construction of the Mackenzie Gas Project. Pr...


TOTAL PAGES: 2