Principal Investigator:Moore, Steve M Licensed Year(s):
2002
20012000 Summary:
A researcher team will travel by boats from Deline to Sahyoue Peninsula and spend 4 days collecting baseline information on wildlife and ecosystem units. Twenty sites will be assessed and classified to ecosystem type. For each site, vegetation and wildli...
Principal Investigator:Mears, Margaret Licensed Year(s):
2000
Summary:
Western was contracted on behalf of Paramount Resources to conduct preliminary baseline studies at Paramount's land holdings, and a proposed access corridor in the Cameron Hills area. The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A preliminary survey of the physical, chemical and biological features of the...
Principal Investigator:Walker-Larsen, Jennifer Licensed Year(s):200320022001
2000
Summary:
Forest Fire Effects on Vegetation and Wildlife Habitat use: Research sites will be accessed by helicopter. Sites are located in burns of different ages. In the summer, small teams will complete vegetation plots, assess species composition and percent cover, and assess wildlife abundance. In the winter, helicopter track surveys will be completed.
Forest Monitoring (ARNEWS and SI/MAB plots): The...
Principal Investigator:Melton, Derek Licensed Year(s):
1998
Summary:
The objective of the study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A literature search for registered archaeological sites within the project area has been started. A helicopter will be used to access the four well sites and the proposed access routes. The development area will be surveyed by foot. All wildlife observations (ma...
Principal Investigator:Melton, Derek Licensed Year(s):
1998
Summary:
The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A literature search for registered archaeological sites within the proposed project area has been initiated. A helicopter will be used to access the four well sites and the proposed access routes. The development area will be surveyed by foot. All wildlife obser...
Principal Investigator:Melton, Derek Licensed Year(s):
1997
Summary:
Main objective is to establish baseline wildlife & fisheries habitat conditions prior to start of Ranger Oil's winter exploration drilling program. All sampling will be done over a 2-3 day period in mid-September. Three well sites are planned for drilling. Well site 1 is near Nota Creek & accessed by the Norman Wells-Tulita winter road plus an existing short cutline. Well site 2 is near Bear Rock ...
Principal Investigator:MacDonald, Gord Licensed Year(s):
1997
Summary:
Activities at the Damoti Lake Project Site will be as follows; 1) Archaeology - short site visit with field survey, 2) Terrestrial work will emphasize vegetation types and their value as wildlife habitat. Specific surveys for signs of moose, furbearers, raptors and other species, 3) Aquatic studies will emphasize habitat values in both lake and stream locations. Water quality work, 4) Hydrology w...