Proposed Helicopter Reconnaissance – Spring and Summer Programs 2014 for Proposed Aklavik West Road and Bridge
Principal Investigator: Kors-Olthof, Rita I
Licensed Year(s): 2014 2011
Summary: The overall goal is to describe the environmental conditions present along the trail and bridge site for planning purposes to avoid, minimize, and/or mitigate potential impacts to the natural, resource, and cultural features along the proposed road and bridge alignment. The priority for observations will be between the turn-off from Bickish Avenue to about 800 m west of the proposed bridge locatio...


Mackenzie Valley Highway Hydrotechnical Field Investigation
Principal Investigator: Moschini, David
Licensed Year(s): 2014
Summary: The information collected will be used for the design of bridges and culverts for the proposed highway. A detailed assessment will be conducted. The detailed assessment will include: • Photograph each of the proposed stream crossing sites (approximately 50); • Establish a tape-line across a representative cross-section of the watercourse within the proposed alignment and measure stream width,...


Stream Crossing Assessment of Select Watercourses along the Inuvik to Tuktoyaktuk Highway Alignment and Rare Plant Survey of Select Borrow Sources
Principal Investigator: Stevens, Jim
Licensed Year(s): 2013
Summary: The purpose of this study is to complete a stream crossing assessment and rare plant survey. STREAM CROSSING ASSESSMENT At each watercourse crossing site (n=12), a fish habitat assessment will be conducted from 300 m downstream to 100m upstream. Watercourses will be accessed via helicopter. The following data will be collected at each watercourse crossings site: • Six transects will be estab...


Inuvik – Tuktoyaktuk Highway 2013-2014 Geotechnical Investigations Program
Principal Investigator: Patrie, Wayne
Licensed Year(s): 2013
Summary: The Government of the Northwest Territories – Department of Transportation (DOT) proposes to conduct geotechnical investigations in the winters of 2013 and 2014. Geotechnical investigations will include drilling of boreholes, sampling and analysis of granular material collected, and installation of thermistor (temperature) cables. The geotechnical investigations are conducted to support design and...


Inuvik to Tuktoyaktuk Highway Project
Principal Investigator: Moore, Steve M
Licensed Year(s): 2010
Summary: The objectives of this study are to determine the presence of fish and the quality of fish habitat at stream crossings along the proposed road alignment. They will be achieved through observations, measurements, and surveys carried out during freshet. These observations will provide an indication of seasonal habitat use at high water, when connectivity to upstream habitats may exist. Similarly, ...


Assessment of Fisheries Potential of the Tuktoyaktuk to Source 177 All-Weather Road Impact Area
Principal Investigator: Krizan, Julia
Licensed Year(s): 2009
Summary: The objectives of this project are to characterize the habitats and shorelines of the streams that would be crossed by the Tuktoyaktuk to Source 177 all-weather road. The impact area will be recorded and referenced with Global Positioning System (GPS) locations. The information will be transferred to a Geographic Information System (GIS) to complete a habitat map for the area. The Hamlet of T...


2003 Route and Site Selection in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Deh Cho Region. During the flights, locations of important land features will be confirmed by Global Positi...


2003 Route and Site Selection in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Sahtu Settlement Area. During the flights, locations of important land features will be confirmed by Global...


2003 Route and Site Selection in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Gwich'in Settlement Area. During the flights, locations of important land features will be confirmed by Glo...


2003 Route and Site Selection in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Inuvialuit Settlement Region. During the flights, locations of important land features will be confirmed by...