5 record(s) found with the tag "road construction" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2003 Route and Site Selection in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Deh Cho Region. During the flights, locations of important land features will be confirmed by Global Positi...


2003 Route and Site Selection in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Sahtu Settlement Area. During the flights, locations of important land features will be confirmed by Global...


2003 Route and Site Selection in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Gwich'in Settlement Area. During the flights, locations of important land features will be confirmed by Glo...


2003 Route and Site Selection in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Inuvialuit Settlement Region. During the flights, locations of important land features will be confirmed by...


Environmental Baseline Program Colomac Area (Indin Lake), N.W.T.
Principal Investigator: Kalich, Laura
Licensed Year(s): 1996
Summary: The work will include seven aspects of research. Water quality will be done through a number of sampling locations at different times of the year. A hydrology study will measure high water discharge and stage measurements at seven streams in the vicinity of the proposed all-weather road. Bathymetric surveys will conducted on lex lake and six smaller un-named lakes in the vicinity of the propos...