21 record(s) found with the tag "resource assessment" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Nahanni Mineral and Energy Resource Assessment (MERA2)
Principal Investigator: Falck, Hendrik
Licensed Year(s): 2005 2004
Summary: Parks Canada would like to expand the existing Nahanni National Park Reserve. Before this can be done, mineral and energy resource assessment (MERA) study is needed for the Greater Nahanni Ecosystem so that mineral deposits or oil fields that could provide jobs and wealth for Northerners and Canadians are not overlooked. This study has five main steps: 1) Review all available bedrock geology ...


Establishment of Permanent Monitoring Plots in South Slave Region
Principal Investigator: Smith, Lisa
Licensed Year(s): 2003
Summary: A network of permanent monitoring plots (PMPs) is required for assessing forest growth and yield in the NWT. These PMPs will be used to: 1) obtain information to assess the rate of forest growth and determine current and potential yield of various fores...


Establishment of Permanent Monitoring Plots in Deh Cho
Principal Investigator: Smith, Lisa
Licensed Year(s): 2003
Summary: A network of permanent monitoring plots (PMPs) is required for assessing forest growth and yield in the NWT. These PMPs will be used to: 1) obtain information to assess the rate of forest growth and determine current and potential yield of various fores...


Non-renewable Resource Assessment, Gwich'in Conservation Zones
Principal Investigator: Lariviere, James
Licensed Year(s): 2003
Summary: The objective of this fieldwork is to assess the non-renewable resources of the Richardson Mountains study area using geochemical sampling and analysis. This work is a requirement for the approval of the Gwich'in Land Use Plan by the federal government....


2003 Route and Site Selection in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Deh Cho Region. During the flights, locations of important land features will be confirmed by Global Positi...


2003 Route and Site Selection in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Sahtu Settlement Area. During the flights, locations of important land features will be confirmed by Global...


2003 Route and Site Selection in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Gwich'in Settlement Area. During the flights, locations of important land features will be confirmed by Glo...


2003 Route and Site Selection in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Inuvialuit Settlement Region. During the flights, locations of important land features will be confirmed by...


Peel Plateau Area, Yukon and NWT Aeromagnetic Survey, Phase VI of Mackenzie Corridor Survey
Principal Investigator: Kiss, Frank
Licensed Year(s): 2003 2002 2001 2000 1999
Summary: This survey will improve public knowledge and understanding of the geology of this area, as no publicly available magnetic coverage exists. Survey lines will be flown at a spacing of 880 metres and a 330 metre mean terrain clearance. The purpose of the s...


Establishment of Permanent Monitoring Plots in Sahtu
Principal Investigator: Smith, Lisa
Licensed Year(s): 2002
Summary: There are three primary objectives of the study; 1) growth and yield information to assess the rate of forest growth and determine current and potential yield of various forest types; 2) NWT cumulative impact monitoring for the Western NWT Biophysical St...


TOTAL PAGES: 3