Principal Investigator:Hammer, Lorne Licensed Year(s):
2006
Summary:
Shell Exploration and Production Company (Shell) is proposing to mobilize the Mobile Offshore Drilling Unit (MODU), Kulluk, from McKinley Bay, Northwest Territories to offshore Alaska, to initiate preparations for an offshore exploration drilling program to be carried out over the next several years. The Kulluk has been inactive and moored in McKinley Bay since 1993. Prior to that, the Kulluk had ...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies.
Route and site reconnaissance comprise: verification of the ...
Principal Investigator:Biggar, Kevin Licensed Year(s):
2006
2005 Summary:
Since the 1970s, the oil and gas industry has drilled at least nineteen exploratory wells in the Kendall Island Bird Sanctuary. Observations at associated drilling mud-sumps have been made; however, there remains a paucity of field data describing site conditions. It is also appreciated that construction of the proposed Mackenzie Valley pipeline will stimulate the development of Niglintgak and Tag...
Principal Investigator:Kokelj, Steven V Licensed Year(s):
2006
2005 Summary:
The research team will collect data to assess environmental conditions at well sites and sumps abandoned during the 1970s and 1980s, and in nearby undisturbed terrain in the Kendall Island Bird Sanctuary (KIBS). Study site locations include: Taglu D-43, Taglu H-54, Taglu C-42, Niglintgak B-19, Kumak K-16, Kumak E-58 and Kumak J-06. Permafrost investigations will take place in the surrounding terr...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The Mackenzie Gas Project has sub-contracted the Fort Simpson Metis to collect and document Traditional Knowledge during the project. Local knowledge and technical/scientific research, in combination with a synthesis of existing technical information, is being used to develop a suitable knowledge base for planning, assessment of impacts and development of environmental protection plans. The Fort S...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The 2006 Traditional Knowledge Studies mark a continuation of Traditional Knowledge work initiated, as part of the Mackenzie Gas Project, with Katlodeeche First Nation in 2005. Local knowledge and technical/scientific research, in combination with a synthesis of existing technical information, is being used to develop a suitable knowledge base for planning, assessment of impacts and development of...
Principal Investigator:Kokelj, Steven V Licensed Year(s):2012201120102009200820072006
2005
Summary:
There are three main parts in the researchers' project: 1) investigating the relationships between air and ground temperatures across treeline; 2) investigating the effects of permafrost degradation on the water quality of tundra lakes; and 3) examining...
Principal Investigator:Van Stempvoort, Dale R. Licensed Year(s):
2005
Summary:
The objectives of this study are to 1) address information gaps with respect to groundwater quality and quantity along the proposed pipeline corridor; 2)gather groundwater information along the corridor between Fort Simpson and Great Bear Lake; 3) examine remediation processes for, and results of, petroleum spills in the north; and 4) help the Department of Transportation investigate potential gro...
Principal Investigator:Seligman, Ben Licensed Year(s):
2005
2004 Summary:
Shell Canada Limited will be surveying the river bottom to see if it is practical to use a barge-mounted gas conditioning facility at the Niglintgak Gas Field in the Mackenzie Delta. The researchers will do a bathymetric survey to identify locations that are not wide enough and/or deep enough for barge passage. Bathymetry is the science of measuring water depths and showing the variations in dep...
Principal Investigator:Johnson, Pascale Licensed Year(s):2006
2005
200420032002 Summary:
The Pointed Mountain Gas Plant, six associated wellsites, and the airstrip are being assessed during the decommissioning process. The site was initially constructed in 1966. The plant has been shut down since September 2001. The Pointed Mountain field has had soil, groundwater, and surface water assessed since 1990. Previous environmental work and public consultation at this site have identifi...