Principal Investigator:Kerr, Daniel E. Licensed Year(s):
1993
Summary:
The researcher will be conducting geological field work in the region defined by the NTS Winter Lake Map (No. 86A). The work will involve surveying the land features and collecting samples of the rock and sediments in order that this information can be summarized on a geological map....
Principal Investigator:Adams, Peter Licensed Year(s):1993
1991
199019881987 Summary:
The project will continue to take measurements of the accumulation of snow on the glaciers and try to ascertain how much snow and ice has been lost or gained since it was measured in 1990. Limnology experiments will be conducted on Colour Lake. Ice regimes will be monitored....
Principal Investigator:Burn, Chris R Licensed Year(s):
1990
1987 Summary:
The research team will monitor the amount of heave that occurs in lake-bottom sediments during winter, after water freezes to the bottom of lakes, because these environments are the best for examining the hydrology of frost heaving....
Principal Investigator:Terroux, A.C.D. Licensed Year(s):
1981
Summary:
(1) Ice thickness determination - Mackenzie Delta Channels - April 1981. (2) Aerial photography of ice break- up - along Mackenzie River - May/June 1981. (3) Monitoring of Mackenzie Delta Lake Process (break-up, etc.) using time lapsed photography - April - November 1981. (4) Inuvik-Tuktoyaktuk Highway Hydrology Study (water distribution, etc.) April/November 1981 (aerial surveys)....
Principal Investigator:McGregor, C.A. Licensed Year(s):
1976
Summary:
Parsons Lake - a quantitive description of vegetation with organic content, ice content and moisture content. Sabine Peninsula - preliminary terrain sensitivity classification for use in planning transporation facilities....