Principal Investigator:Jacobson, Toni Lynne Licensed Year(s):
1996
Summary:
Transportation to Bluefish Hydro Electric Plant is by boat from the Miramar Con Mine Dock at Prosperous Lake. Two one day field trips to the Plant are scheduled during the collection period. Equipment to be utilized include gill or seine nets, Gee traps, backpack electrofishing unit, water flow meter, water sample bottles, canoe and outboard motor. Sample species include whitefish, lake trout, ...
Principal Investigator:Sherstone, David A. Licensed Year(s):1993
1992
199119901988 Summary:
Ice gauges are installed on river ice once the ice is strong enough to support researchers (20 gauges for the Mackenzie Delta and 15 gauges for Hay River). These gauges are read every 10 days to obtain total ice thickness, white ice thickness and snow depth. From these data, the rates of ice growth and decay can be calculated, and the approximate date of maximum ice thickness can be determined....
Principal Investigator:Boyes, Donald M. Licensed Year(s):19951994
1990
Summary:
The Researcher and team propose to provide a better understanding of the present fluvial regime in the area and a method of assessing the effects of uncontrollable influences such as global warming and controllable factores such as hydro-electric and pipeline development....
Principal Investigator:Hirst, S.M. Licensed Year(s):
1981
Summary:
To put in place a series of automatic water level recorders (14 recorders in 8 locations) as part of assessing possible downstream environmental impacts as a result of proposed hydro- electric developments on the Liard River....
Principal Investigator:Noton, Leigh Licensed Year(s):
1981
Summary:
To carry out a water sampling program to establish baseline data on prevailing conditions as part of a program to assess the possible impact of hydro-electric development in the area....
Principal Investigator:Ash, Gary R. Licensed Year(s):
1981
Summary:
To identify major environmental concerns of the proposed Hydroelectric development as related to fish....
Principal Investigator:Noton, Leigh Licensed Year(s):
1980
Summary:
To undertake a water sampling program, upstream and downstream of the proposed Slave River Hydro development, to assist in assessing the general impact of this project....
Principal Investigator:McCart, Peter Licensed Year(s):
1980
Summary:
As part of the Slave River Hydro Study to conduct a continuing assessment of the fisheries resources of the area. life histories of the fish populations will be recorded. Basic data will be gathered on the aquatic habitat. The resource will also be evaluated as to its local, regional and national significance....
Principal Investigator:Gill, Don Licensed Year(s):
1979
Summary:
To collect samples of soil and vegetation to assess the ecological importance of the spring flood and downstream importance of hydroelectric developments....
Principal Investigator:Chang-Kue, Ken T.J. Licensed Year(s):
1976
Summary:
Investigate the fish population in order to accurately define the fisheries resource and critical aspects of their life cycle with reference to the impact of a proposed hydroelectric project....