Principal Investigator:Beaulieu, Michel S Licensed Year(s):
2014
2013 Summary:
The primary purpose of this research project is to determine how key recommendations from the Mackenzie Valley Pipeline Inquiry (commonly referred to as the Berger Inquiry or, for the purpose of this research, the Inquiry) have affected oil and gas development in the Northwest Territories (NWT) over the past thirty-six years. Through analysis of the Inquiry and the recommendations that resulted fr...
Principal Investigator:Martin, Sandy D Licensed Year(s):
2006
Summary:
The objective of the proposed summer geotechnical investigations is to gather information on soil and ground conditions adjacent to a proposed pipeline right-of-way in the Mackenzie Valley. The gathered information will be used in preparing subsequent regulatory applications. The proposed investigations will focus on four potential borrow sources, which will yield information for use in determinin...
Principal Investigator:Povey, Andrew Licensed Year(s):
2005
200420032002 Summary:
The route and site reconnaissance activities will be used to: review the proposed location for a potential pipeline route through the Gwich’in Settlement Area (GSA); revisit or determine the optimal locations for proposed gas compression facilities near Inuvik; revisit or determine the optimal locations for infrastructure sites, roads, granular resource sites and potential revegetation test sites;...
Principal Investigator:Nichol, Susan L. Licensed Year(s):
2005
Summary:
The objective is to improve knowledge about landslides in the Mackenzie Valley. The results of this study will enable better environmental impact assessments and help to reduce environmental impacts related to the construction and operation of the proposed Mackenzie Valley pipeline. As well, the results will have a broader application to a wide range of future development activities in the region....
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
Summary:
A field office will be set up in Norman Wells. Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope. Two temporary rig camps will be set up, one near the Hamlet of Tulita and the other near the intersection of...
Principal Investigator:Harris, Les Licensed Year(s):2005
2004
Summary:
The objective of the study is to track and document the movements of broad whitefish using radio telemetry, and to identify critically important areas over the next two years. This study will be the first of its kind to track and document the movements o...
Principal Investigator:Graburn, Larry Licensed Year(s):
2003
Summary:
This study will gather information to assess the soil and ground conditions at representative frost heave study sites within the municipal boundaries of the Town of Norman Wells. The information will be used in assessing the feasibility of a pipeline in...
Principal Investigator:Graburn, Larry Licensed Year(s):
2003
Summary:
The proposed activities form part of a Summer Field Geotechnical Investigation Program to be conducted in the Deh Cho Region during 2003. The objective of this program is to gather information that will assess the soil and ground conditions at a represe...
Principal Investigator:Collard, Tod Licensed Year(s):
2001
Summary:
The proposed field research program on lands located within the Sahtu Settlement Area will include the following general areas of study: (1) freshwater aquatics (freshwater fish and their habitats, water quality, hydrology); (2) terrestrial wildlife, including waterfowl; (3) vegetation and soils; (4) archaeology; and (5) noise. For all studies, access will be by helicopter, boat or on foot, as ap...
Principal Investigator:Collard, Tod Licensed Year(s):
2001
Summary:
The proposed field research program within the Gwich'in Settlement Area will include the following general areas of study: (1) freshwater aquatics (freshwater fish and their habitats, water quality, hydrology); (2) terrestrial wildlife, including waterfowl; (3) vegetation and soils; (4) archaeology; and (5) noise. For all studies, access will be by helicopter, boat or on foot, as appropriate. Mo...