33 record(s) found in the location "" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Ekati Diamond Mine
Principal Investigator: Pacholski, Laura J
Licensed Year(s): 2022
Summary: This licence has been issued for the scientific research application No.5107. The main objectives of the field work for 2022 will be to determine if the Ekati Diamond Mine is having an effect on the surrounding aquatic environment, wildlife, and air quality, and to provide baseline data for areas where mine development may occur in the future. In winter, water samples will be collected unde...


Nechalacho Project
Principal Investigator: Drygeese, Cody RJ
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.4994. The goal of this project is to document existing environmental conditions surrounding the Project area. Studies may include the following. Hydrology studies include the measurement of selected lake inflow and outflow and stream profile through field surveys, and installation of data loggers to continually monitor l...


Impact of climate change on catchment biogeochemistry in plains and shield regions
Principal Investigator: Olefeldt, David
Licensed Year(s): 2021 2019 2018
Summary: This licence has been issued for the scientific research application No.4734. The objective of this research is to identify impacts of climate change and permafrost thaw on pond methane emissions, and on water chemistry in streams that drain peatland-rich catchments. Impacts on methane emissions will be assessed. Specific objectives are: 1) to characterize the trends and variability in magn...


Ekati Engineering and Environmental Monitoring Programs
Principal Investigator: Pacholski, Laura J
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.4886. The main objectives of the field work for 2021 will be to determine if the Ekati Diamond Mine is having an effect on the surrounding aquatic environment, wildlife, and air quality; and to provide baseline data for areas where mine development may occur in the future. In winter, water samples will be collected unde...


De Beers Canada Snap Lake Mine Environmental Monitoring 2021
Principal Investigator: McLean, Sarah C
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.4858. The objective of the project is to conduct environmental monitoring of wildlife (incidental observations only), vegetation, air quality, hydrology, and aquatics in the Snap Lake study area. Methods used are outlined in the management and monitoring plans (aquatic effects monitoring program, water management plan [s...


Geochemical Characterization and Reactive Transport Simulation of Metal Leaching and Acid Generation in Waste Rock from the Ekati Diamond Mine, NT
Principal Investigator: Blowes, David W.
Licensed Year(s): 2020
Summary: This licence has been issued for the scientific research application No.4769. The objectives of this project are to provide critical insights into the potential long-term water quality impacts that may arise from waste-rock weathering; to develop scaling relationships to predict contaminant release, transport, and attenuation in the field; and to inform closure-cover design to mitigate the gene...


A monitoring program for Frame Lake
Principal Investigator: Gray, Derek K
Licensed Year(s): 2020 2019
Summary: This licence has been issued for the scientific research application No.4640. The research team is planning to establish a long-term monitoring program in Frame Lake to monitor water quality, zooplankton and benthic invertebrates. Water quality probes will be set up at a central monitoring point on the lake. A buoy will be anchored to the lake bottom and the probes will be attached to the bu...


Tlicho All-Season Road
Principal Investigator: Walmsley, Caroline
Licensed Year(s): 2020 2019
Summary: This licence has been issued for the scientific research application No.4587. The objective is to conduct monitor to ensure that the project is overall compliant with the environmental permit and approval conditions and requirements. Water monitoring at water crossing locations will be required for any in-water construction and where there is potential for entrainment of sediments. This inc...


Con Mine 2019 Supplemental Benthic Invertebrate Sampling Study
Principal Investigator: Irving, Elaine
Licensed Year(s): 2019
Summary: This licence has been issued for the scientific research application No.4574. The objective is to sample benthic invertebrates in Jackfish Bay (exposure area) and Kam Bay (reference area), to confirm benthic results from 2018 and determine if treated Con Mine effluent is affecting the benthic community in Jackfish Bay. Benthic invertebrate samples will be collected at five stations in each ...


Using the past to inform the future: A paleoecological perspective of the impacts of drought and fire on lakes, permafrost and forests
Principal Investigator: Pisaric, Michael FJ
Licensed Year(s): 2019 2018 2017 2016
Summary: This licence has been issued for the scientific research application No.4564. The objectives of this research are to examine the frequency and severity of past wildfire and drought (drought-like) conditions in the southern Northwest Territories. Specifically, the research team will examine the following questions: 1) how frequent and severe have fires been in the; 2) are fires becoming more fre...


TOTAL PAGES: 4