4 record(s) found in the location "" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

TERRE-NET: Controls on the Release of Contaminants from Gold Tailings at the Giant Mine, Yellowknife, NT
Principal Investigator: Blowes, David W.
Licensed Year(s): 2024 2023 2022 2021 2020 2019 2018 2017
Summary: This licence has been issued for the scientific research application No.5447. The objectives of this project are to: 1) determine the magnitude and rate of release of arsenic and other toxic elements from the Giant Mine tailings to groundwater; 2) evaluate remediation alternatives for tailings management, including the effects of proposed engineered covers; and, 3) apply novel characterization ...


Investigating Anthropogenic Sources of Groundwater Contamination in the Canadian Arctic
Principal Investigator: Hamel, Emilienne
Licensed Year(s): 2022
Summary: This licence has been issued for the scientific research application No.5245. The objectives of this project are to contribute to the territorial government’s groundwater monitoring plan by establishing baseline conditions for solutes in the local groundwater around the solid waste facility. The research team aim to improve current groundwater vulnerability frameworks to account for anthropogen...


Geothermal Potential of Flooded Underground Mines: Con Mine Study, Yellowknife, NWT, Canada
Principal Investigator: Terlaky, Viktor
Licensed Year(s): 2021
Summary: This licence has been issued for the scientific research application No.5000. This year's field project has the objective to obtain accurate temperature measurement of the water in the mine at various depths. The measurements will be used to refine the analytical and numerical models for geothermal energy potential estimate of the mine. The more accurate measurements are taken, the better refin...


Tlicho All-Season Road
Principal Investigator: Walmsley, Caroline
Licensed Year(s): 2020 2019
Summary: This licence has been issued for the scientific research application No.4587. The objective is to conduct monitor to ensure that the project is overall compliant with the environmental permit and approval conditions and requirements. Water monitoring at water crossing locations will be required for any in-water construction and where there is potential for entrainment of sediments. This inc...


TOTAL PAGES: 1