Principal Investigator:Tran, Lisa Licensed Year(s):
2022
Summary:
This licence has been issued for the scientific research application No.5143.
The goal of this project is to collect environmental monitoring of wildlife (incidental observations only), vegetation, air quality, hydrology and aquatics in the Snap Lake study area.
Methods used are outlined in the management and monitoring plans (aquatic effects monitoring program, water management plan, wildli...
Principal Investigator:Drygeese, Cody RJ Licensed Year(s):
2021
Summary:
This licence has been issued for the scientific research application No.4994.
The goal of this project is to document existing environmental conditions surrounding the Project area.
Studies may include the following. Hydrology studies include the measurement of selected lake inflow and outflow and stream profile through field surveys, and installation of data loggers to continually monitor l...
Principal Investigator:Stepney, Jessica Licensed Year(s):
2021
Summary:
This licence has been issued for the scientific research application No.5051.
This project will collect additional environmental and geotechnical samples to complete the remedial design. The former Stark Lake Uranium Exploration site has undergone multiple investigations over the years, and a data gap analysis has indicated that there is additional information required to complete the remedial ...
Principal Investigator:Doig, Lorne Licensed Year(s):
2021
Summary:
This licence has been issued for the scientific research application No.4988.
The objectives of this project are to determine: 1) From the outer Slave River Delta (SRD) (river-water dominated) to the apex of the SRD (runoff dominated), what the current status of nutrients and contaminants in SRD wetland ecosystems are; 2) How trace elements (e.g., mercury) move through SRD wetland food webs; an...
Principal Investigator:DeWolfe, Michelle Licensed Year(s):
2021
Summary:
This licence has been issued for the scientific research application No.4766.
The objectives of this project are to update and increase the understanding of the geological history of this area of the north-central Slave craton, Northwest Territories.
This work will be conducted mostly by foot with access along the water provided by canoe and zodiac boat. The research team will be walking the...
Principal Investigator:Abiven, Samuel Licensed Year(s):
2021
Summary:
This licence has been issued for the scientific research application No.4956.
The objective of this project are to measure the age and stock of organic carbon derived from wildfires (fire-derived carbon) in the Mackenzie River region and examine long- and short-term processes controlling the size and distribution of fire-derived carbon stocks in soils.
The research team will measure fire-der...
Principal Investigator:Dyck, Brendan Licensed Year(s):
2021
Summary:
This licence has been issued for the scientific research application No.4723.
The main object of this research project is to determine the strength of Earth's lower crust and how this portion of the crust responds to tectonic forces.
Two weeks of fieldwork will be carried out at the Great Slave Lake Shear Zone to acquire the appropriate samples to explore stress across a fault zone. The majo...
Principal Investigator:Martel, Edith Licensed Year(s):
2021
202020192018 Summary:
This licence has been issued for the scientific research application No.4949.
This project will examine sedimentary and volcanic rocks that were deposited on an old craton, in a basin that formed during the collision of two cratons. The research team aim to document which cratons were responsible for the basin’s formation and at what time they collided.
The team will spend 20 days in the fie...
Principal Investigator:Pacholski, Laura J Licensed Year(s):
2021
Summary:
This licence has been issued for the scientific research application No.4886.
The main objectives of the field work for 2021 will be to determine if the Ekati Diamond Mine is having an effect on the surrounding aquatic environment, wildlife, and air quality; and to provide baseline data for areas where mine development may occur in the future.
In winter, water samples will be collected unde...
Principal Investigator:Panayi, Damian Licensed Year(s):
2020
2019201820172016 Summary:
This licence has been issued for the scientific research application No.4787.
The objective of this project is to document existing environmental conditions, in preparation for future regulatory applications.
Various environmental studies will be initiated each year, according to budgets and information priorities.
Hydrology studies include the measurement of selected lake inflow and outf...