Principal Investigator:Lennie-Misgeld, Peter Licensed Year(s):
2011
2010 Summary:
NT Hydro is in the process of characterizing the hydro potential of the NWT, and the hydrological information collected from the four gauging sites will be used to determine if any hydro potential exists on these four rivers. These gauges are not being installed in relation to development of a specific hydro project on these water bodies.
Installation of the gauging stations:
Hydrometric g...
Principal Investigator:d'Entremont, Marc Licensed Year(s):
2004
Summary:
The Department of Transportation (DOT), Government of the Northwest Territories is responsible for the planning, design, construction, and maintenance of safe transportation infrastructure, capable of meeting user needs in the NWT. As part of the DOT's o...
Principal Investigator:Uren, Shane Licensed Year(s):
2004
Summary:
The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...
Principal Investigator:Ash, Gary R. Licensed Year(s):
1981
Summary:
To identify major environmental concerns of the proposed Hydroelectric development as related to fish....
Principal Investigator:Nieminen, G.A. Licensed Year(s):
1980
Summary:
To undertake environmental field studies relating tothe environmental assessment of a mine/mill development and a winterd access road. The studies will include fisheries studies, vegetation identification, soil sampling, and wildlife habitat assessment....
Principal Investigator:Wooley, David R. Licensed Year(s):
1976
Summary:
To carry out aerial reconnaissance studies (locating and counting ungulates) associated with environmental input into pipeline design and location....