17 record(s) found in the location "South Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Phase I Environmental Site Assessments of Rocher River(SM169), Little Dal/ Coates Island(SM053), Tennoco Root River(SM034), and HWY #33 KM 508 Drum Dump, Northwest Territories
Principal Investigator: Diplock, David A
Licensed Year(s): 2009
Summary: The overall objective of the Phase I ESA is to identify and document any actual or potential environmental risks associated with the subject properties and provide recommendations for further assessment and/or risk management. The two main goals needed to meet the objective are: 1) Produce a Records Review Report of existing site information; components of the records review will be to identify ...


Phase III Environmental Site Assessment - Outpost Island Mine
Principal Investigator: Winch, Susan
Licensed Year(s): 2009
Summary: The objective of this study is to conduct a site investigation of the Outpost Island Mine, to further determine current environmental and physical conditions. This will include the identification and quantification of environmental impacts in soil, sediment, surface water and groundwater, and the identification of any hazardous or non-hazardous materials left on site. The research team will b...


Environmental Baseline Studies, Tamerlane Ventures Inc., Pine Point Mining Project
Principal Investigator: Moore, Steve M
Licensed Year(s): 2005
Summary: The objective of the field program is to document baseline conditions within the study area to be used for a water licence and land use application towards development of a lead and zinc mine adjacent to the old Pine Point property. This includes completing Ecosystem Classification, Surface Water Quality Sampling, Fish Habitat Assessments, and a Wildlife Utilization and Diversity Study. Field s...


Fish Habitat Creation Study, Lutsel K'e and Deline, NWT
Principal Investigator: d'Entremont, Marc
Licensed Year(s): 2004
Summary: The Department of Transportation (DOT), Government of the Northwest Territories is responsible for the planning, design, construction, and maintenance of safe transportation infrastructure, capable of meeting user needs in the NWT. As part of the DOT's o...


Environmental Assessment for Petroleum Exploration, Drilling and Development, Cameron Hills, NWT.
Principal Investigator: Mears, Margaret
Licensed Year(s): 2000
Summary: Western was contracted on behalf of Paramount Resources to conduct preliminary baseline studies at Paramount's land holdings, and a proposed access corridor in the Cameron Hills area. The objective of this study is to determine the presence or absence of fish habitat and wildlife in the vicinity of the proposed project. A preliminary survey of the physical, chemical and biological features of the...


The Role of Scientific Information in the Environmental Assessment Process
Principal Investigator: Satterthwaite, Andrew
Licensed Year(s): 1992
Summary: The researcher will investigate perceptions of northern residents concerning their participation in environmental assessment hearings. This information will be used in a larger project looking at the role of scientific and traditional knowledge in the environmental assessment process....


Licence #2021
Principal Investigator: Sherstone, D.A.
Licensed Year(s): 1976
Summary: 1) To acquire aerial photography of hydrologic characteristics of the Mackenzie and Lower Liard River basins. 2) To acquire photography of environmentally sensititve areas along the Central Arctic gas pipeline route. 3) To acquire aerial photography of glacier research sites in the Arctic Islands area (particularly ...


TOTAL PAGES: 2