Principal Investigator:Smith, Sharon S Licensed Year(s):
2006
Summary:
Twelve sampling sites in the K'asho Got’ine District of the Sahtu Settlement Area have been selected for this project, with preferred locations chosen near existing winter roads and the C.N.T. trail for continuous site accessibility and to minimize disturbance to the environment. One or two boreholes up to 20 m in depth will be drilled at each site in order to capture local environmental variabili...
Principal Investigator:Graburn, Larry Licensed Year(s):
2005
2004 Summary:
This research is part of an aerial reconnaissance program to study spring breakup at the major watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Region in the north. The resea...