Principal Investigator:Povey, Andrew Licensed Year(s):
2004
2003 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Ltd., and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study has two compone...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Sahtu Settlement Area. Surveys of fish and fish habitat will be made at 62 permanently flowing watercourses, as well as 15 intermittent streams. These studies will include hydrology and water quality work as well. All of the aquatic ...
Principal Investigator:Metikosh, Serge Licensed Year(s):
2001
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located on Crown Land along the tentative pipeline corridor in the Sahtu Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller ...
Principal Investigator:Melton, Derek Licensed Year(s):
1997
Summary:
Main objective is to establish baseline wildlife & fisheries habitat conditions prior to start of Ranger Oil's winter exploration drilling program. All sampling will be done over a 2-3 day period in mid-September. Three well sites are planned for drilling. Well site 1 is near Nota Creek & accessed by the Norman Wells-Tulita winter road plus an existing short cutline. Well site 2 is near Bear Rock ...