Principal Investigator:Weagle, Ken V Licensed Year(s):2005
2004
Summary:
The purpose of this fieldwork is for the collection of baseline data to support an anticipated application to the Mackenzie Valley Land and Water Board. There are 5 main components of the program. 1) Air quality and climate; General air quality will be m...
Principal Investigator:English, Michael C Licensed Year(s):20032002
2001
2000 Summary:
The crew will fly from Yellowknife to the Tundra Ecosystem Research Station camp on Daring Lake from BHP (Ekati Mine) by helicopter. The research team itinerary consists of: (1) setting up the camp; (2) sampling all of the major streams flowing into Daring Lake for chemistry and instantaneous flow; (3) walking through several basins to decide on an intensive sampling site; and (4) installing dri...