4 record(s) found in the location "North Slave Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Fisheries Survey of Hill Creek (located on Highway 3)
Principal Investigator: Dahl-Fequet, Monica L
Licensed Year(s): 2005
Summary: The objective of this project is to collect biological and hydrological information on Hill Creek. It is unknown as to whether or not the culvert at the Hill Creek highway crossing is large enough to allow for the spring migration of spawning fish. The researchers will collect fisheries and habitat information on Hill Creek. This data will include fish presence/absence, lifestage and species com...


Seasonal movements of lake trout, lake whitefish and northern pike in a small northern Shield lake.
Principal Investigator: Dick, Terry A.
Licensed Year(s): 2005 2004
Summary: The objective of this research is to study what lake trout, whitefish and pike eat and their movements in a small northern Shield lake (Chitty Lake). Transportation of personnel and equipment into and out of Chitty Lake will be by single engine float plane (Air Tindi). During this study, the researchers will use standardized gill nets, a backpack electroshocker, a seine net, VEMCO acoustic tra...


Ecological Conditions in the Proposed Discharge Route of the Colomac Mine, NT
Principal Investigator: McGurk, Michael
Licensed Year(s): 2005 2004
Summary: The researchers will measure water quality, aquatic ecology and the status of fish populations in ponds and lakes along the proposed discharge route of mine water from the Colomac Mine (North Pond, L-Shaped Lake, Paddle Lake, Lake 315, and Lower Lake) and compare those data with data collected from reference lakes (Steeves Lake, Baton Lake, and Spanner Lake). Work will include taking three samples...


Fish Habitat Compensation Monitoring Program - Highway #3, Stagg River
Principal Investigator: Moore, Peter
Licensed Year(s): 2001 2000
Summary: This program is a detailed assessment of the created/enhanced habitat at Frank Channel, based on fish use and function in comparison with habitat design targets. Habitat monitoring will require seasonal assessments within the open water period at times associated with the targeted fish's life stages (Northern Pike). During early spring, mid summer and late summer, Frank Channel habitat will be m...


TOTAL PAGES: 1