Principal Investigator:Draho, Bob Licensed Year(s):
2010
2009 Summary:
The objectives of this four day field survey is to inspect the 4 hydrology stations and 1 meteorology station to ensure they are in working order, repair if required, and download site-specific weather and stream flow data from the stations.
Equipment at each hydrostation consists of a datalogger (to record) and a pressure transducer (to detect fluid pressure and produce a signal related to the...
Principal Investigator:Hoos, Rick Licensed Year(s):
2007
Summary:
The objectives of the single site visit in 2007 are as follows: (1) to re-install instruments at the 4 existing hydrostations, so that data will be recorded automatically during the summer season; Tyhee personnel will remove the instruments (a datalogger and pressure transducer for each station location) at the end of the season, before freezeup; (2) download data from the existing weather station...