11 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Devon Canada Corporation - Traditional Knowledge Study for the Proposed Beaufort Sea Offshore Drilling Program
Principal Investigator: Fabijan, Michael F
Licensed Year(s): 2004 2003
Summary: This study will focus on collecting information from Inuvialuit elders and harvesters, both male and female. 20-25 members from each community will be interviewed. The area of concern will be the lease area (EL 420) and adjacent lands, including Pelly Is...


2003 Winter Baseline Noise Monitoring Study in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003 2002
Summary: Noise monitoring will be conducted in the Taglu lease and in the Swimming Point, Parsons Lake and Jimmy Lake regions. These data will provide estimates of background ambient noise which will be needed before construction of the Mackenzie Gas Project. Pr...


Marine Bird Study of the Environmental Studies Program for the Proposed Beaufort Sea Offshore Drilling Program (Devon Canada Corporation)
Principal Investigator: Evans, Kevin
Licensed Year(s): 2002
Summary: Migratory birds occur within and adjacent to the 4 Devon leases. The Kendall Island Bird Sanctuary and adjacent areas in the outer western portion of the Mackenzie Delta support relatively high densities of nesting, brooding-rearing, moulting and staging...


2002 Terrestrial Studies in the Inuvialuit Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The proposed research program involves terrestrial studies in the Inuvialuit Settlement Area to be conducted during 2002. Initial vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classification was essentially completed in the Inuvialuit Settlement Area. Vegetation studies during 2002 will focus on locating areas of rare or uncommon pl...


2002 Route and Site Selection in the Inuvialuit Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Inuvialuit Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locatio...


2002 Aquatic Studies in the Inuvialuit Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Inuvialuit Settlement Area. The research team will survey 14 permanent watercourses, as well as several intermittent or seasonal watercourses and approximately 20 lakes located along the study corridor to determine aquatic characteri...


2002 Terrestrial Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The proposed research program involves terrestrial studies in the Gwich'in Settlement Area to be conducted during 2002. Initial Vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classification was essentially completed in the Gwich'in Settlement Area. Vegetation studies during 2002 will focus on locating areas of rare or uncommon plants...


2002 Route and Site Selection in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: Route and site selection flights will be used to: (1) determine the location for a potential natural gas pipeline route and associated developments through the Gwich'in Settlement Area; (2) visually inspect and confirm land forms and geotechnical features; (3) identify land features that may be important to the location or construction of a potential gas pipeline; and (4) determine the locations...


2002 Aquatic Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Gwich'in Settlement Area. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or Renewable Resource Council (RRC) representative. Depending upon accessibility, sites will b...


Vegetation, Forestry and Soils Surveys: Gwich'in Settlement Area
Principal Investigator: Bush, Dana
Licensed Year(s): 2001
Summary: The BC Terrestrial Ecosystem Mapping inventory standard will be used to provide a uniform method of describing vegetation, soil and terrain based on air photo interpretation and field data collection. The sites will be contained within a 1 km corridor with 'bulges' in areas of special concern such as river crossings. Surveying sites accessed by helicopter, boat, vehicle and/or on foot. To avoid c...


TOTAL PAGES: 2