Biological Studies of Waters Along the Proposed Mackenzie Gas Project Pipeline Route - Inuvialuit Settlement Region
Principal Investigator: Evans, Marlene S.
Licensed Year(s): 2009 2008 2007 2006
Summary: This license has been issued for the scientific research application #837. This study is designed to examine lakes possibly affected by the proposed Mackenzie Gas Project pipeline, and lakes that can serve as future control/reference sites. The researchers will measure the following: nutrients and metals in lake water and sediments, lake water quality (DO, pH, conductivity, etc.), and benthic i...


2005 Terrestrial Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The 2005 terrestrial studies in the Inuvialuit Settlement Region (ISR) will include vegetation classification, rare plant surveys, and landform, soil and permafrost investigations. The studies will be conducted by three- or four-person crews supported by helicopter and based in Inuvik. A local assistant will be hired as part of each survey team. Air calls from a helicopter will be used to map ...


2005 Winter and Spring Aquatic Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003
Summary: The researchers did a number of baseline studies during 2001 through 2004 as part of the Mackenzie Gas Project. These studies are continuing in 2005. Local knowledge and technical/scientific research is being used to design plans, assess impacts, and develop environmental protection plans. The aquatics field crews will consist of two Mackenzie Project Environment Group researchers and a local as...


2002 Aquatic Studies in the Inuvialuit Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Inuvialuit Settlement Area. The research team will survey 14 permanent watercourses, as well as several intermittent or seasonal watercourses and approximately 20 lakes located along the study corridor to determine aquatic characteri...


2002 Terrestrial Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The proposed research program involves terrestrial studies in the Gwich'in Settlement Area to be conducted during 2002. Initial Vegetation investigations were conducted in summer 2001 to classify vegetation along the study corridor. This classification was essentially completed in the Gwich'in Settlement Area. Vegetation studies during 2002 will focus on locating areas of rare or uncommon plants...


2002 Aquatic Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Gwich'in Settlement Area. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or Renewable Resource Council (RRC) representative. Depending upon accessibility, sites will b...


2001 Fish and Fish Habitat and Water Quality Surveys: Gwich'in Settlement Area
Principal Investigator: Metikosh, Serge
Licensed Year(s): 2001
Summary: The research team proposes to collect information about fish habitat features and use on 111 watercourse crossings along the tentative pipeline corridor in the Gwich'in Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller watercourses (t...