9 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Krizan, Julia Licensed Year(s):
2009
Summary:
The objectives of this project are to characterize the habitats and shorelines of the streams that would be crossed by the Tuktoyaktuk to Source 177 all-weather road. The impact area will be recorded and referenced with Global Positioning System (GPS) locations. The information will be transferred to a Geographic Information System (GIS) to complete a habitat map for the area.
The Hamlet of T...
Principal Investigator:Graburn, Larry Licensed Year(s):
2004
Summary:
This research forms part of an aerial reconnaissance program to observe the characteristic break-up patterns at selected watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Regi...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
2003 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study has three co...
Principal Investigator:Graburn, Larry Licensed Year(s):2004
2003
Summary:
This field reconnaissance program involves preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, anchor field pads (Niglintgak, Taglu, Parson's Lake), watercourse crossings, water sources for ice roa...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Inuvialuit Settlement Area. The research team will survey 14 permanent watercourses, as well as several intermittent or seasonal watercourses and approximately 20 lakes located along the study corridor to determine aquatic characteri...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Gwich'in Settlement Area. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or Renewable Resource Council (RRC) representative. Depending upon accessibility, sites will b...
Principal Investigator:Metikosh, Serge Licensed Year(s):
2001
Summary:
The research team proposes to collect information about fish habitat features and use on 111 watercourse crossings along the tentative pipeline corridor in the Gwich'in Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller watercourses (t...
Principal Investigator:Jasper, J.N. Licensed Year(s):
1976
Summary:
To measure peak flows to determine designs for proposed culvert and bridge sites along the Mackenzie Highway and to assess Environmental conditions (erosion, etc.) at stream crossings before and after construction and to determine their effects on fish migration....
Principal Investigator:Whitney, Paul Licensed Year(s):
1975
Summary:
Survey all streams to be crossed by the proposed Foothills Pipeline, conduct aerial and ground surveys of rare and endangered species, and inspect all stockpile and comprssor stations and wharfing sites associated with the proposed pipeline for Foothills Pipeline....