5 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Bird, Sam P Licensed Year(s):
2011
Summary:
The objective of this research project is to collect supplementary soil and water samples to further delineate areas of the site affected by hydrocarbons, metals and salinity and to assess area for possible impacts where infrastructure has been removed.
Soil samples will be collected with hand tools and placed in ziplock bags to roughly measure hydrocarbons while in the field and into glass ja...
Principal Investigator:Gowman, Joel A Licensed Year(s):
2008
Summary:
The research is focused on accelerating the remediation of Federal Contaminated Sites Action Program (FCSAP) on Victoria Island. The research focuses on determining the remaining risks at the sites and developing a plan to address those risks. There will be an environmental site assessment which involves the collection of soil, sediment, water, and materials (a detailed explanation of the sampl...
Principal Investigator:Kokelj, Steven V Licensed Year(s):2006
2005
Summary:
Since the 1970's, the oil and gas industry has drilled at least 19 exploratory wells in the Kendall Island Bird Sanctuary (KIBS), but there is a shortage of field data describing environmental conditions at the well-sites and drilling-mud sumps. In Marc...
Principal Investigator:Reimer, Kenneth J. Licensed Year(s):
1997
Summary:
The Environmental Services Group has been requested by Defence Construction Canada and DCLU, to continue conducting environmental investigations of former DEW Line sites. Personnel will collect soil, sediment, plant, water, paintchips and insulation samples from areas of suspected or known contamination. The samples will be analyzed for inorganic elements and PCB's. In addition a small-scale bio...
Principal Investigator:Washuta, A.S. Licensed Year(s):1993
1992
Summary:
The information gathered at the DEW Line Sites will be used to prepare detailed contractual documents for the environmental clean-up and demolition work at 10 sites. Public consultation meetings will take place at communities in the vicinity of the investigated DEW Line Sites....