5 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped): Not seeing the results you want? Tryadvanced search.
Principal Investigator:Evans, Marlene S. Licensed Year(s):200920082007
2006
Summary:
This study is designed to fill gaps in Environment Canada’s understanding of the aquatic environment potentially impacted by various aspects of the Mackenzie Gas Project (MGP). Potential stressors including: increased erosion, nutrient releases from sewage discharges, other chemical releases, water withdrawals, impacts of barge traffic, increased atmospheric emissions, etc. The focus will be on th...
Principal Investigator:Povey, Andrew Licensed Year(s):2005
2004
2003 Summary:
Imperial Oil Resources Ltd., Aboriginal Pipeline Group, ConocoPhillips Canada (North) Ltd., Shell Canada Limited, and ExxonMobil Canada Properties are continuing baseline studies begun in 2001 as part of the Mackenzie Gas Project. This study has three co...
Principal Investigator:Povey, Andrew Licensed Year(s):20052004
2003
2002 Summary:
The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Inuvialuit Settlement Region as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic...
Principal Investigator:Povey, Andrew Licensed Year(s):200520042003
2002
Summary:
The research team proposes to collect information about fish habitat features and use on watercourse crossings located within the tentative pipeline corridor in the Gwich'in Settlement Area. All aquatic studies will be conducted by three or four-person crews. Each crew will include a local researcher or Renewable Resource Council (RRC) representative. Depending upon accessibility, sites will b...
Principal Investigator:Metikosh, Serge Licensed Year(s):
2001
Summary:
The research team proposes to collect information about fish habitat features and use on 111 watercourse crossings along the tentative pipeline corridor in the Gwich'in Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller watercourses (t...