11 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Tuk Base Demolition Supplementary Sampling
Principal Investigator: Bird, Sam P
Licensed Year(s): 2011
Summary: The objective of this research project is to collect supplementary soil and water samples to further delineate areas of the site affected by hydrocarbons, metals and salinity and to assess area for possible impacts where infrastructure has been removed. Soil samples will be collected with hand tools and placed in ziplock bags to roughly measure hydrocarbons while in the field and into glass ja...


Muskox Mine and Grandroy Mine Exploration Areas - Environmental Site Assessments
Principal Investigator: Gowman, Joel A
Licensed Year(s): 2008
Summary: The research is focused on accelerating the remediation of Federal Contaminated Sites Action Program (FCSAP) on Victoria Island. The research focuses on determining the remaining risks at the sites and developing a plan to address those risks. There will be an environmental site assessment which involves the collection of soil, sediment, water, and materials (a detailed explanation of the sampl...


Proposed Unipkat I-22 Phase II Environmental Site Assessment
Principal Investigator: Berry, Dan
Licensed Year(s): 2007
Summary: The purpose of the Unipkat I-22 Phase II Environmental Site Assessment is to identify contaminates and their concentrations, as well as to delineate the extent of any contamination at this historic drilling sump site. The Unipkat I-22 Phase II ESA is designed to gain the maximum amount of site data. Potential contaminants of concern will be identified during the historical file review, but it i...


Taglu D-43 Well Site Surficial Clean Up and Sump Assessment; 2007 Taglu G-33 Well Site Surface Clean Up and Sump Assessment; and 2007 Debris Clean Up at Ivik J-26 Well Site
Principal Investigator: Sampson, Jack
Licensed Year(s): 2007
Summary: The purpose of this project is to conduct debris clean up and further environmental assessment of the drilling sumps at the Taglu D-43 and G-33 well sites, as a follow-up to the 2004 limited investigation to confirm sump contents are appropriately contained. Furthermore, at the G-33 site, previously reported hydrocarbon stained soil will be removed and debris will be cleaned up at the Ivik J-26 we...


Environmental Soil Chemistry at Abandoned Drilling Mud-Sumps in the Kendall Island Bird Sanctuary, Mackenzie Delta Region
Principal Investigator: Biggar, Kevin
Licensed Year(s): 2006 2005
Summary: Since the 1970s, the oil and gas industry has drilled at least nineteen exploratory wells in the Kendall Island Bird Sanctuary. Observations at associated drilling mud-sumps have been made; however, there remains a paucity of field data describing site conditions. It is also appreciated that construction of the proposed Mackenzie Valley pipeline will stimulate the development of Niglintgak and Tag...


Historic Sump Site Assessment
Principal Investigator: Etty, Craig
Licensed Year(s): 2005
Summary: There are three objectives for the evaluation of historic sumps during this project. The first objective is to field verify the "Protocol for the Assessment of Drilling Mud Sumps” for evaluating historic sump site locations. The second objective is to identify, inventory, and assess the environmental conditions at the historic sump sites, and the third objective is to compile consistent data on ...


Environmental conditions at abandoned drilling mud-sumps in the Kendall Island Bird Sanctuary, Mackenzie Delta Region
Principal Investigator: Kokelj, Steven V
Licensed Year(s): 2006 2005
Summary: Since the 1970's, the oil and gas industry has drilled at least 19 exploratory wells in the Kendall Island Bird Sanctuary (KIBS), but there is a shortage of field data describing environmental conditions at the well-sites and drilling-mud sumps. In Marc...


Delineation of Komokuk Beach (BAR-1), and Nicholson Peninsula (BAR-4).
Principal Investigator: Reimer, Kenneth J.
Licensed Year(s): 1997
Summary: The Environmental Services Group has been requested by Defence Construction Canada and DCLU, to continue conducting environmental investigations of former DEW Line sites. Personnel will collect soil, sediment, plant, water, paintchips and insulation samples from areas of suspected or known contamination. The samples will be analyzed for inorganic elements and PCB's. In addition a small-scale bio...


Using Drilling Mud Sumps to Determine How Well Permafrost Contains Contaminants
Principal Investigator: Dyke, Larry
Licensed Year(s): 1998 1997
Summary: This project is intended to determine the amount by which fluids disposed of in abandoned oil well drilling mud disposal pits (sumps) have migrated into surrounding frozen ground. The sumps are not presently considered to pose any kind of environmental hazard but they do offer a unique opportunity to determine the effectiveness of permafrost as a containment for waste fluids. The main activity i...


Environmental Assessment of the Hamlet of Tuktoyaktuk Solid Waste Disposal Area, Saw Mill Bay and Cape Parry, and cleanup of a former DEW Line site, BAR-3 Tuktoyaktuk.
Principal Investigator: Reimer, Ken
Licensed Year(s): 1996
Summary: The Environmental Science Group (ESG) has been requested by DND and NWSO to conduct environmental investigations of former DEW Line sites and other military bases in the NWT. Personnel will collect soil, plant, water, paint chips and insulating material for analysis of potential contaminants....


TOTAL PAGES: 2