6 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Proposed ConocoPhillips Canada (North) Limited Parsons Lake Gas Field Summer 2007 Access Research Program
Principal Investigator: Henderson, Bob C.
Licensed Year(s): 2007
Summary: The objective of this research program is to collect topographical information relating to the potential for: (a) a winter access road for the transport of large modules from the east channel of the Mackenzie River, from the vicinity of the mouth of Pete's Creek and the Lucas Point area, to the proposed Parsons Lake north pad site; (b) a barge anchorage location on the east channel of the Mackenzi...


2006 Biophysical and Reconnaissance Studies in the Inuvialuit Settlement Region
Principal Investigator: Martin, Sandy D
Licensed Year(s): 2006
Summary: The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies. Route and site reconnaissance comprise: verification of the ...


2005 Route and Site Reconnaissance in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The route and site reconnaissance activities will be used to: review the proposed location for a potential gas gathering system and potential pipeline route through the Inuvialuit Settlement Region; revisit or determine the optimal locations for infrastructure sites, roads, granular resource sites, water withdrawal sites, and potential revegetation test sites; visually inspect and confirm land for...


2005 Winter Field Geotechnical Investigation Program in the Inuvialuit Settlement Region
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005
Summary: This program will investigate five potential sources of granular materials and subsurface drilling at the proposed Storm Hills Pigging Facility. It is estimated that the program will require up to 90 days to complete. Up to 45 persons are expected to wor...


2003 Field Reconnaissance - Inuvialuit Settlement Region
Principal Investigator: Graburn, Larry
Licensed Year(s): 2004 2003
Summary: This field reconnaissance program involves preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, anchor field pads (Niglintgak, Taglu, Parson's Lake), watercourse crossings, water sources for ice roa...


Urban Planning and Life Between the Houses
Principal Investigator: Bisgaard, Inngi
Licensed Year(s): 1991
Summary: The Researcher will continue to study urban planning in arctic areas. This field season investigation will include how people use outdoor spaces in relation to weather, destinations and playgrounds....