4 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Inuvik Solar Resource Assessment Monitoring Campaign
Principal Investigator: Schwarz, David
Licensed Year(s): 2024 2023
Summary: This licence has been issued for the scientific research application No.5482. The objective of this project is to conduct a solar resource assessment monitoring campaign at the Inuvik Satellite Station Facility (ISSF). NRG Systems designs solar resource assessment systems that suit a variety of climates, terrains, and applications. Aurora Research Institute (ARI) is currently in the process ...


Validation of Wind LiDaR in Canadian Subarctic
Principal Investigator: Gall, Patrick N.
Licensed Year(s): 2022 2021
Summary: This licence has been issued for the scientific research application No.5158. The goal of this project is to verify that wind LiDaR technology has reached a suitable maturity that it can be used in place of a meteorological tower to perform wind resource assessment in subarctic and arctic conditions. The study will use an existing NRG 60m Meteorological tower located in Norman Wells, and a ...


Northern Sustainable House Data Analysis
Principal Investigator: Zmeureanu, Radu
Licensed Year(s): 2016
Summary: The analysis will be done on a data set that covers at least the time interval from October 2014 to November 2015. The following steps are proposed: 1. Pre-process of data: data quality, identification of outliers, missing data, faulty sensors. 2. Development of a working good data file. 3. Identification of the pattern of energy use such as the hourly, daily and monthly profiles. 4. Develo...


Wind Energy Monitoring at Storm Hills: 2012-2014
Principal Investigator: Trimble, Annika EV
Licensed Year(s): 2014 2013 2012
Summary: The objective of this wind monitoring proposal is to measure the wind energy potential at Storm Hills for two years, as part of an alternative energy study for the Inuvik area. Wind data will be collected using an existing infrastructure (New North Networks tower) at the site. Two full years of wind measurements and an economic analysis will be necessary to confirm this prediction and the viab...


TOTAL PAGES: 1