7 record(s) found in the location "Inuvialuit Settlement Region" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Archaeological and Fish Habitat Assessment for the Tuktoyaktuk to Inuvik Highway
Principal Investigator: Krizan, Julia
Licensed Year(s): 2011
Summary: A Fish Habitat Assessment and an Archaeological Assessment are required for the proposed Inuvik to Tuktoyaktuk Highway. A Fish Habitat Assessment and an Archaeological Impact Assessment Report will be developed with data obtained from the proposed highway corridor during fall 2011. IMG-Golder Corp. is proposing to carry out a fish habitat and archaeological assessment program along the highway ...


Proposed ConocoPhillips Canada (North) Limited Parsons Lake Gas Field Summer 2007 Access Research Program
Principal Investigator: Henderson, Bob C.
Licensed Year(s): 2007
Summary: The objective of this research program is to collect topographical information relating to the potential for: (a) a winter access road for the transport of large modules from the east channel of the Mackenzie River, from the vicinity of the mouth of Pete's Creek and the Lucas Point area, to the proposed Parsons Lake north pad site; (b) a barge anchorage location on the east channel of the Mackenzi...


2005 Winter Field Geotechnical Investigation Program in the Inuvialuit Settlement Region
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005
Summary: This program will investigate five potential sources of granular materials and subsurface drilling at the proposed Storm Hills Pigging Facility. It is estimated that the program will require up to 90 days to complete. Up to 45 persons are expected to wor...


Integrated Geoscience Studies of the Mackenzie Delta and Nearby Coastal Environments
Principal Investigator: Wright, Fred J
Licensed Year(s): 2012 2011 2010 2009 2008 2007 2006 2004
Summary: This pilot study will address identified gaps in knowledge critical for assessing the impacts of regional oil and gas development in the vicinity of the Mackenzie Delta and Richards Island, with respect to exploration and drilling activities, well-head a...


Licence #4036
Principal Investigator: Tucker, Nigel
Licensed Year(s): 1984
Summary: (1) To examine the "state-of-the-art" regarding site selection techniques for energy facilities. (2) To visit some of the locations which have previously been identified as potential shorebase sites....


Licence #2059
Principal Investigator: McGregor, C.A.
Licensed Year(s): 1976
Summary: Parsons Lake - a quantitive description of vegetation with organic content, ice content and moisture content. Sabine Peninsula - preliminary terrain sensitivity classification for use in planning transporation facilities....


Licence #2001
Principal Investigator: Jasper, J.N.
Licensed Year(s): 1976
Summary: To measure peak flows to determine designs for proposed culvert and bridge sites along the Mackenzie Highway and to assess Environmental conditions (erosion, etc.) at stream crossings before and after construction and to determine their effects on fish migration....


TOTAL PAGES: 1