9 record(s) found in the location "Gwich'in Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2005 Winter and Spring Aquatic Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003
Summary: The researchers did a number of baseline studies during 2001 through 2004 as part of the Mackenzie Gas Project. These studies are continuing in 2005. Local knowledge and technical/scientific research is being used to design plans, assess impacts, and develop environmental protection plans. The aquatics field crews will consist of two Mackenzie Project Environment Group researchers and a local as...


2004 Spring Break-up Watercourse Investigation Program - Gwich'in Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005 2004
Summary: This research forms part of an aerial reconnaissance program to observe the characteristic break-up patterns at selected watercourse crossings along the proposed pipeline right-of-way from the Deh Cho region in the south to the Inuvialuit Settlement Regi...


2003 Field Reconnaissance - Gwich'in Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2004 2003
Summary: This field reconnaissance program involves preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential campsites, borrow sources...


Aquatic Effects Study for the Ferry Crossings near Tsiigehtchic and Fort McPherson, NT
Principal Investigator: Mills, Hal
Licensed Year(s): 2002 2001
Summary: There are a number of specific tasks for the Aquatics Effects Study at the ferry landings. The research team will complete an assessment of fish habitat quality. They will determine which fish species utilize the area, collect Gwich'in Traditional Knowl...


2001 Fish and Fish Habitat and Water Quality Surveys: Gwich'in Settlement Area
Principal Investigator: Metikosh, Serge
Licensed Year(s): 2001
Summary: The research team proposes to collect information about fish habitat features and use on 111 watercourse crossings along the tentative pipeline corridor in the Gwich'in Settlement Area. The amount of work to be completed at each watercourse crossing will be determined during the reconnaissance level survey and will largely be driven by their size and flow characteristics. Smaller watercourses (t...


Licence #2343
Principal Investigator: Bouckhout, Leo W.
Licensed Year(s): 1978
Summary: (1) To survey native grasses, legumes and shrubs and evaluate their usefulness for revegetating disturbed areas. (2) To conduct fish counts, collect water samples for chemical data determination and prepare descriptions of all water crossings....


Licence #2001
Principal Investigator: Jasper, J.N.
Licensed Year(s): 1976
Summary: To measure peak flows to determine designs for proposed culvert and bridge sites along the Mackenzie Highway and to assess Environmental conditions (erosion, etc.) at stream crossings before and after construction and to determine their effects on fish migration....


Licence #1908
Principal Investigator: Whitney, Paul
Licensed Year(s): 1975
Summary: Survey all streams to be crossed by the proposed Foothills Pipeline, conduct aerial and ground surveys of rare and endangered species, and inspect all stockpile and comprssor stations and wharfing sites associated with the proposed pipeline for Foothills Pipeline....


Licence #1869
Principal Investigator: Davison, D.M.
Licensed Year(s): 1975
Summary: (1) To gather field data in order to assess drainage and erosion control and to evaluate the stability of slopes along the proposed Foothills Pipeline and at key river crossings; (2) To gather subsurface soil and ice information to analyze typical slope conditions for pipe support designs for Foothills Pipeline Limited....


TOTAL PAGES: 1