10 record(s) found in the location "Gwich'in Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

2005 Winter Field Geotechnical Investigation Program in the Gwich'in Settlement Area
Principal Investigator: Graburn, Larry
Licensed Year(s): 2005 2004
Summary: Field investigation activities will be directed and carried out from existing accommodation in Inuvik. The work area will be accessed from the Dempster Highway and the C.N.T. trail. Secondary access will follow existing winter roads, rights-of-way, and...


2003 Route and Site Selection in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Gwich'in Settlement Area. During the flights, locations of important land features will be confirmed by Glo...


2003 Spring, Summer and Fall Aquatic Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2005 2004 2003 2002
Summary: The research team proposes to conduct studies of fish and fish habitat, hydrology, hydrogeology and water quality in the Gwich'in Settlement Area as part of the baseline studies for the Mackenzie Gas Project. These studies will complete the aquatic inve...


2003 Winter Baseline Noise Monitoring Program in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003
Summary: Noise monitoring will be conducted at two potential sites for a compressor station near Travaillant Lake. These data will provide estimates of background ambient noise, which is needed before construction of the Mackenzie Gas Project. The proposed monit...


2002 Baseline Noise Monitoring Program in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licensed Year(s): 2003 2002
Summary: The baseline noise monitoring program in the Gwich'in Settlement Area will be located at the proposed location of the potential gas compression facilities near Inuvik. The collected data will provide background estimates of ambient noise. This informatio...


Licence #4124
Principal Investigator: Fairbarns, Matt
Licensed Year(s): 1984
Summary: To choose study sites for work to be done next Spring on investigation of vegetation-permafrost-microclimate relationships associated with subarctic pipeline disturbances....


Licence #2493
Principal Investigator: Vaartnou, H.
Licensed Year(s): 1979
Summary: To establish test plots of various species of grass to determine the best types to be used to revegetate sites disturbed by pipeline construction....


Licence #2355
Principal Investigator: Bouckhout, Leo W.
Licensed Year(s): 1978
Summary: (1) To determine present and future land and resource usage> (2) To evaluate the probable impact of a pipeline and propose measures to minimize it....


Licence #2111
Principal Investigator: Wankiewicz, Anthony
Licensed Year(s): 1977
Summary: To study permafrost near Arctic streams at sites near Inuvik and several locations in the Keewatin. This study is to provide baseline information on coupled heat-transfer processes relevant to cold gas pipeline stream crossings. The ground temperature will be monitored at stream cross sections at the different sites....


Licence #1869
Principal Investigator: Davison, D.M.
Licensed Year(s): 1975
Summary: (1) To gather field data in order to assess drainage and erosion control and to evaluate the stability of slopes along the proposed Foothills Pipeline and at key river crossings; (2) To gather subsurface soil and ice information to analyze typical slope conditions for pipe support designs for Foothills Pipeline Limited....


TOTAL PAGES: 1