3 record(s) found in the location "Gwich'in Settlement Area" (multi-year projects are grouped):
Not seeing the results you want? Tryadvanced search.

Instrumentation and thermal monitoring of the Gunghi Creek Arch Bridge Replacement
Principal Investigator: Beddoe, Ryley
Licensed Year(s): 2024 2023 2022
Summary: This licence has been issued for the scientific research application No.5466. The objectives of this research are to: 1) monitor the thermal regime of the embankment, arch, piles and road subgrade post the construction of the arch replacement; 2) use measured ground temperatures to calibrate numerical models for understanding and predicting bridge, road and embankment stability; 3) analyze mult...


Influence of Mackenzie Delta Channel Thermal Regime on Permafrost
Principal Investigator: Ensom, Timothy P
Licensed Year(s): 2010 2009
Summary: The purpose of this research is to measure the seasonal temperatures of streambeds at several sites in the Mackenzie delta and adjacent tundra uplands, and predict the implications of these temperature patterns for local permafrost conditions. This project will seek to determine whether channel size and depth affect the annual thermal regime of the streambed, and will also use collected temperatu...


Snow Accumulation/Runoff in High Latitude Permafrost Basins
Principal Investigator: Marsh, Philip
Licensed Year(s): 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 1990
Summary: The primary objective of this project is to develop improved understanding of the fluxes of water and energy in northern regions, and to develop improved computer models of these processes. The Trail Valley Creek site will be accessed by helicopter and s...


TOTAL PAGES: 1